IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2016
Principal Product Automotive parts
NAICS 336320 - Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $100,000,000-$500,000,000
# of Employees 400
Plant Area (Sq.Ft.) 230,000
Annual Production 800,000 Units
Production Hrs. Annual 8,400
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $655,886 8,918,939 kWh $0.07
Electricity Fees $49,010 - $ -
Natural Gas $154,584 16,936 MMBtu $9.13
TOTAL ENERGY COSTS $859,480
RECOMMENDED SAVINGS* $80,762 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,327
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,902
Cost:
$2,000
$5,592 76,044 $310 - - - $5,592
76,044
kWh
$310
-
$
-
-
MMBtu
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$17,793
Cost:
$6,200
$16,858 229,238 $935 - - - $16,858
229,238
kWh
$935
-
$
-
-
MMBtu
03: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$7,730
Cost:
$6,000
$7,324 99,587 $406 - - - $7,324
99,587
kWh
$406
-
$
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,058
Cost:
$79,271
$19,004 258,420 $1,054 - - - $19,004
258,420
kWh
$1,054
-
$
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,037
Cost:
$250
$5,720 77,782 $317 - - - $5,720
77,782
kWh
$317
-
$
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,425
Cost:
$4,765
$8,930 121,431 $495 - - - $8,930
121,431
kWh
$495
-
$
-
-
MMBtu
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$13,817
Cost:
$30,000
- - - - $13,817 1,513 -
-
kWh
-
-
$
$13,817
1,513
MMBtu
TOTAL RECOMMENDED Savings:
$80,762
Cost:
$128,486
$63,428 862,502 $3,517 - $13,817 1,513 $63,428
862,502
kWh
$3,517
-
$
$13,817
1,513
MMBtu
TOTAL IMPLEMENTED Savings:
$15,327
Cost:
$6,765
$14,522 197,475 $805 - - - $14,522
197,475
kWh
$805
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas