IAC logo
IAC Assessment: UA0170
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0170
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2016
Principal Product Security Glass
NAICS 327215 - Glass Product Manufacturing Made of Purchased Glass
SIC 3231 - Products Of Purchased Glass
Sales $10,000,000-$50,000,000
# of Employees 113
Plant Area (Sq.Ft.) 180,000
Annual Production 550,000 Units
Production Hrs. Annual 4,420
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $397,953 4,946,860 kWh $0.08
Electricity Fees $31,345 - $ -
Natural Gas $9,380 1,030 MMBtu $9.11
TOTAL ENERGY COSTS $438,678
RECOMMENDED SAVINGS* $69,148 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,259
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Electricity Usage Electricity Fees
$ kWh $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$40,043
Cost:
$13,993
$38,481 478,326 $1,562 - $38,481
478,326
kWh
$1,562
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,349
Cost:
$27,272
$9,945 123,622 $404 - $9,945
123,622
kWh
$404
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$7,746
Cost:
-
$7,444 92,532 $302 - $7,444
92,532
kWh
$302
-
$
04: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$5,881
Cost:
$7,219
$5,652 70,261 $229 - $5,652
70,261
kWh
$229
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,533
Cost:
$1,115
$3,395 42,205 $138 - $3,395
42,205
kWh
$138
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,100
Cost:
$350
$1,057 13,135 $43 - $1,057
13,135
kWh
$43
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$496
Cost:
$870
$477 5,923 $19 - $477
5,923
kWh
$19
-
$
TOTAL RECOMMENDED Savings:
$69,148
Cost:
$50,819
$66,451 826,004 $2,697 - $66,451
826,004
kWh
$2,697
-
$
TOTAL IMPLEMENTED Savings:
$20,259
Cost:
$36,476
$19,469 242,011 $790 - $19,469
242,011
kWh
$790
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Electricity Fees Electricity Usage Electricity Fees