Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Alabama |
---|---|
Assessment Year | 2017 |
Principal Product | Automobiles |
NAICS | 336112 - Light Truck and Utility Vehicle Manufacturing |
SIC | 3711 - Motor Vehicles And Car Bodies |
Sales | >$500,000,000 |
# of Employees | 4,600 |
Plant Area (Sq.Ft.) | 3,736,000 |
Annual Production | 366,000 Units |
Production Hrs. Annual | 5,000 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $18,604,216 | 292,105,926 | kWh | $0.06 |
Natural Gas | $3,417,235 | 1,018,864 | MMBtu | $3.35 |
TOTAL ENERGY COSTS | $22,021,451 | |||
RECOMMENDED SAVINGS* | $550,748 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $56,190 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $435,778 Cost: $988,290 |
$435,778 | 6,841,100 | - | - |
$435,778 6,841,100 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $21,405 Cost: $588 |
$21,405 | 336,084 | - | - |
$21,405 336,084 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER |
Savings: $49,747 Cost: $100,000 |
$(-237) | (-3,728) | $49,984 | 14,693 |
$(-237) (-3,728) kWh |
$49,984 14,693 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $221 Cost: $564 |
- | - | $221 | 66 |
- - kWh |
$221 66 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2211 USE OPTIMUM TEMPERATURE |
Savings: $33,738 Cost: $8,460 |
- | - | $33,738 | 10,059 |
- - kWh |
$33,738 10,059 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT |
Savings: $826 Cost: $2,820 |
$826 | 12,963 | - | - |
$826 12,963 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $9,033 Cost: $42,204 |
$9,033 | 141,834 | - | - |
$9,033 141,834 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $550,748 Cost: $1,142,926 |
$466,805 | 7,328,253 | $83,943 | 24,818 | $466,805 7,328,253 kWh |
$83,943 24,818 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $56,190 Cost: $12,432 |
$22,231 | 349,047 | $33,959 | 10,125 | $22,231 349,047 kWh |
$33,959 10,125 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||