IAC logo
IAC Assessment: UA0186
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0186
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2017
Principal Product Precision machined artillery
NAICS 332993 - Ammunition (except Small Arms) Manufacturing
SIC 3489 - Ordnance And Accessories, Nec
Sales $50,000,000-$100,000,000
# of Employees 230
Plant Area (Sq.Ft.) 120,000
Annual Production 625,000 Units
Production Hrs. Annual 7,200
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $331,173 5,825,250 kWh $0.06
Electricity Demand $78,451 16,393 kW-months/year $4.79
Electricity Fees $43,985 - $ -
TOTAL ENERGY COSTS $453,609
RECOMMENDED SAVINGS* $45,704 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,784
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$28,247
Cost:
$52,665
$23,185 407,818 $3,415 713 $1,647 - $23,185
407,818
kWh
$3,415
713
kW-months/year
$1,647
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,872
Cost:
$740
$1,763 31,011 - - $109 - $1,763
31,011
kWh
-
-
kW-months/year
$109
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,673
Cost:
$500
$6,259 110,104 $967 202 $447 - $6,259
110,104
kWh
$967
202
kW-months/year
$447
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,615
Cost:
$4,645
$5,344 94,006 $885 185 $386 - $5,344
94,006
kWh
$885
185
kW-months/year
$386
-
$
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,297
Cost:
$60
$1,221 21,476 - - $76 - $1,221
21,476
kWh
-
-
kW-months/year
$76
-
$
TOTAL RECOMMENDED Savings:
$45,704
Cost:
$58,610
$37,772 664,415 $5,267 1,100 $2,665 - $37,772
664,415
kWh
$5,267
1,100
kW-months/year
$2,665
-
$
TOTAL IMPLEMENTED Savings:
$9,784
Cost:
$5,445
$8,328 146,493 $885 185 $571 - $8,328
146,493
kWh
$885
185
kW-months/year
$571
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees