IAC logo
IAC Assessment: UA0189
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0189
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2018
Principal Product Bread
NAICS 311811 - Retail Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $50,000,000-$100,000,000
# of Employees 120
Plant Area (Sq.Ft.) 87,000
Annual Production 45,000,000 Pounds
Production Hrs. Annual 8,597
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $257,263 4,813,500 kWh $0.05
Electricity Demand $39,696 9,694 kW-months/year $4.09
Electricity Fees $42,570 - $ -
Natural Gas $225,215 26,842 MMBtu $8.39
TOTAL ENERGY COSTS $564,744
RECOMMENDED SAVINGS* $51,550 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,288
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$21,964
Cost:
$45,000
- - - - - - $21,964 2,618 -
-
kWh
-
-
kW-months/year
-
-
$
$21,964
2,618
MMBtu
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$13,298
Cost:
$50
- - - - - - $13,298 1,585 -
-
kWh
-
-
kW-months/year
-
-
$
$13,298
1,585
MMBtu
03: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE Savings:
$3,482
Cost:
$50
- - - - - - $3,482 415 -
-
kWh
-
-
kW-months/year
-
-
$
$3,482
415
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,745
Cost:
$5,828
$4,813 90,058 $594 145 $338 - - - $4,813
90,058
kWh
$594
145
kW-months/year
$338
-
$
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,704
Cost:
$100
$3,113 58,242 $373 91 $218 - - - $3,113
58,242
kWh
$373
91
kW-months/year
$218
-
$
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,357
Cost:
$3,000
$2,860 53,509 $300 73 $197 - - - $2,860
53,509
kWh
$300
73
kW-months/year
$197
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$51,550
Cost:
$54,028
$10,786 201,809 $1,267 309 $753 - $38,744 4,618 $10,786
201,809
kWh
$1,267
309
kW-months/year
$753
-
$
$38,744
4,618
MMBtu
TOTAL IMPLEMENTED Savings:
$16,288
Cost:
$8,978
$10,786 201,809 $1,267 309 $753 - $3,482 415 $10,786
201,809
kWh
$1,267
309
kW-months/year
$753
-
$
$3,482
415
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas