Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Alabama |
---|---|
Assessment Year | 2018 |
Principal Product | Lost Foam Castings |
NAICS | 331524 - Aluminum Foundries (except Die-Casting) |
SIC | 3365 - Aluminum Foundries |
Sales | >$500,000,000 |
# of Employees | 165 |
Plant Area (Sq.Ft.) | 126,000 |
Annual Production | 500,000 Tons |
Production Hrs. Annual | 5,408 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,744,142 | 28,880,871 | kWh | $0.06 |
Electricity Fees | $(-19,103) | - | $ | - |
Natural Gas | $83,580 | 17,599 | MMBtu | $4.75 |
TOTAL ENERGY COSTS | $1,808,619 | |||
RECOMMENDED SAVINGS* | $226,651 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $20,176 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Electricity Usage | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $70,570 Cost: $200,000 |
$83,960 | 1,390,296 | $(-1,553) | - | $(-11,837) | (-2,492) |
$83,960 1,390,296 kWh |
$(-1,553) - $ |
$(-11,837) (-2,492) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7273 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM |
Savings: $62,836 Cost: $165,000 |
$24,215 | 400,982 | $(-448) | - | $39,069 | 8,225 |
$24,215 400,982 kWh |
$(-448) - $ |
$39,069 8,225 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS |
Savings: $63,989 Cost: $119,600 |
$65,195 | 1,079,574 | $(-1,206) | - | - | - |
$65,195 1,079,574 kWh |
$(-1,206) - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $13,960 Cost: $1,000 |
$14,223 | 235,515 | $(-263) | - | - | - |
$14,223 235,515 kWh |
$(-263) - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $6,216 Cost: $1,912 |
- | - | - | - | $6,216 | 1,309 |
- - kWh |
- - $ |
$6,216 1,309 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $9,080 Cost: $25,456 |
$9,251 | 153,183 | $(-171) | - | - | - |
$9,251 153,183 kWh |
$(-171) - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $226,651 Cost: $512,968 |
$196,844 | 3,259,550 | $(-3,641) | - | $33,448 | 7,042 | $196,844 3,259,550 kWh |
$(-3,641) - $ |
$33,448 7,042 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $20,176 Cost: $2,912 |
$14,223 | 235,515 | $(-263) | - | $6,216 | 1,309 | $14,223 235,515 kWh |
$(-263) - $ |
$6,216 1,309 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Electricity Usage | Electricity Fees | Natural Gas |