IAC Assessment: UA0193
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0193
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2018
Principal Product Lost Foam Castings
NAICS 331524 - Aluminum Foundries (except Die-Casting)
SIC 3365 - Aluminum Foundries
Sales >$500,000,000
# of Employees 165
Plant Area (Sq.Ft.) 126,000
Annual Production 500,000 Tons
Production Hrs. Annual 5,408
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,744,142 28,880,871 kWh $0.06
Electricity Fees $(-19,103) - $ -
Natural Gas $83,580 17,599 MMBtu $4.75
TOTAL ENERGY COSTS $1,808,619
RECOMMENDED SAVINGS* $226,651 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,176
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$70,570
Cost:
$200,000
$83,960 1,390,296 $(-1,553) - $(-11,837) (-2,492) $83,960
1,390,296
kWh
$(-1,553)
-
$
$(-11,837)
(-2,492)
MMBtu
02: 2.7273 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM Savings:
$62,836
Cost:
$165,000
$24,215 400,982 $(-448) - $39,069 8,225 $24,215
400,982
kWh
$(-448)
-
$
$39,069
8,225
MMBtu
03: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$63,989
Cost:
$119,600
$65,195 1,079,574 $(-1,206) - - - $65,195
1,079,574
kWh
$(-1,206)
-
$
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$13,960
Cost:
$1,000
$14,223 235,515 $(-263) - - - $14,223
235,515
kWh
$(-263)
-
$
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,216
Cost:
$1,912
- - - - $6,216 1,309 -
-
kWh
-
-
$
$6,216
1,309
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,080
Cost:
$25,456
$9,251 153,183 $(-171) - - - $9,251
153,183
kWh
$(-171)
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$226,651
Cost:
$512,968
$196,844 3,259,550 $(-3,641) - $33,448 7,042 $196,844
3,259,550
kWh
$(-3,641)
-
$
$33,448
7,042
MMBtu
TOTAL IMPLEMENTED Savings:
$20,176
Cost:
$2,912
$14,223 235,515 $(-263) - $6,216 1,309 $14,223
235,515
kWh
$(-263)
-
$
$6,216
1,309
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas