Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2018
Principal Product Tea
NAICS 312111 - Soft Drink Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $50,000,000-$100,000,000
# of Employees 95
Plant Area (Sq.Ft.) 85,000
Annual Production 39,000 Thousand Gallons
Production Hrs. Annual 6,440
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $327,935 5,560,800 kWh $0.06
Electricity Demand $199,208 13,623 kW-months/year $14.62
Electricity Fees $(-44,582) - $ -
Natural Gas $204,209 18,308 MMBtu $11.15
TOTAL ENERGY COSTS $686,770
RECOMMENDED SAVINGS* $23,500 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,344
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,401
Cost:
$5,562
$3,489 59,155 $1,711 117 $201 - $3,489
59,155
kWh
$1,711
117
kW-months/year
$201
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,943
Cost:
$2,465
$4,062 68,910 $1,660 114 $221 - $4,062
68,910
kWh
$1,660
114
kW-months/year
$221
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,667
Cost:
$500
$4,390 74,437 $2,029 139 $248 - $4,390
74,437
kWh
$2,029
139
kW-months/year
$248
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,489
Cost:
-
$5,285 89,629 - - $204 - $5,285
89,629
kWh
-
-
kW-months/year
$204
-
$
TOTAL RECOMMENDED Savings:
$23,500
Cost:
$8,527
$17,226 292,131 $5,400 370 $874 - $17,226
292,131
kWh
$5,400
370
kW-months/year
$874
-
$
TOTAL IMPLEMENTED Savings:
$11,344
Cost:
$8,027
$7,551 128,065 $3,371 231 $422 - $7,551
128,065
kWh
$3,371
231
kW-months/year
$422
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees