IAC logo
IAC Assessment: UA0212
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0212
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2019
Principal Product Rocket Engine Testing
NAICS 336412 - Aircraft Engine and Engine Parts Manufacturing
SIC 3724 - Aircraft Engines And Engine Parts
Sales $50,000,000-$100,000,000
# of Employees 50
Plant Area (Sq.Ft.) 100,000
Annual Production 500 Pieces
Production Hrs. Annual 3,120
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $96,376 1,189,832 kWh $0.08
TOTAL ENERGY COSTS $96,376
RECOMMENDED SAVINGS* $29,405 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,249
Cost:
$36,249
$7,249 89,497 - - $7,249
89,497
kWh
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$92
Cost:
$129
$92 1,134 - - $92
1,134
kWh
-
-
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$18,989
Cost:
$30,818
$23,847 294,408 $(-4,858) (-1,182) $23,847
294,408
kWh
$(-4,858)
(-1,182)
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,075
Cost:
$9,350
$3,075 37,962 - - $3,075
37,962
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$29,405
Cost:
$76,546
$34,263 423,001 $(-4,858) (-1,182) $34,263
423,001
kWh
$(-4,858)
(-1,182)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas