IAC logo
IAC Assessment: UA0215
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0215
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2019
Principal Product Composite Bus Panels
NAICS 336211 - Motor Vehicle Body Manufacturing
SIC 3713 - Truck And Bus Bodies
Sales $100,000,000-$500,000,000
# of Employees 64
Plant Area (Sq.Ft.) 60,000
Annual Production 7,500 Units
Production Hrs. Annual 2,125
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $101,149 916,200 kWh $0.11
Electricity Demand $19,280 4,815 kW-months/year $4.00
Electricity Fees $7,243 - $ -
Natural Gas $47,219 4,650 MMBtu $10.15
TOTAL ENERGY COSTS $174,891
RECOMMENDED SAVINGS* $19,802 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,811
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$12,317
Cost:
$50
$11,619 105,243 - - $698 - $11,619
105,243
kWh
-
-
kW-months/year
$698
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,328
Cost:
$11,266
$4,173 37,799 $853 213 $302 - $4,173
37,799
kWh
$853
213
kW-months/year
$302
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$663
Cost:
$539
$625 5,658 - - $38 - $625
5,658
kWh
-
-
kW-months/year
$38
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$816
Cost:
$50
$610 5,524 $160 40 $46 - $610
5,524
kWh
$160
40
kW-months/year
$46
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$678
Cost:
$970
$564 5,109 $76 19 $38 - $564
5,109
kWh
$76
19
kW-months/year
$38
-
$
TOTAL RECOMMENDED Savings:
$19,802
Cost:
$12,875
$17,591 159,333 $1,089 272 $1,122 - $17,591
159,333
kWh
$1,089
272
kW-months/year
$1,122
-
$
TOTAL IMPLEMENTED Savings:
$13,811
Cost:
$1,070
$12,793 115,876 $236 59 $782 - $12,793
115,876
kWh
$236
59
kW-months/year
$782
-
$
Savings
Cost
$ kWh $ kW-months/year $ $