IAC Assessment: UA0216
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0216
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2019
Principal Product Steel rebar
NAICS 331110 - Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3312 - Blast Furnaces And Steel Mills
Sales $100,000,000-$500,000,000
# of Employees 260
Plant Area (Sq.Ft.) 1,000,000
Annual Production 876,000 Units
Production Hrs. Annual 8,760
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $11,925,323 282,941,787 kWh $0.04
Natural Gas $3,218,058 792,625 MMBtu $4.06
TOTAL ENERGY COSTS $15,143,381
RECOMMENDED SAVINGS* $853,943 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Ancillary Material Cost Electricity Usage Natural Gas Ancillary Material Cost
$ kWh $ MMBtu $ $
01: 2.1125 CONVERT TO OXYFUEL BURNERS Savings:
$683,991
Cost:
$1,000,000
- - $698,390 172,017 $(-14,399) - -
-
kWh
$698,390
172,017
MMBtu
$(-14,399)
-
$
02: 2.1122 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT Savings:
$3,963
Cost:
$927
- - $3,963 976 - - -
-
kWh
$3,963
976
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$67,295
Cost:
$83,671
$67,295 1,569,566 - - - - $67,295
1,569,566
kWh
-
-
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$55,565
Cost:
$163,736
$55,565 1,318,278 - - - - $55,565
1,318,278
kWh
-
-
MMBtu
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,592
Cost:
$9,552
$7,592 180,106 - - - - $7,592
180,106
kWh
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$25,527
Cost:
$8,775
$25,527 605,626 - - - - $25,527
605,626
kWh
-
-
MMBtu
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$10,010
Cost:
$50
$10,010 237,491 - - - - $10,010
237,491
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$853,943
Cost:
$1,266,711
$165,989 3,911,067 $702,353 172,993 $(-14,399) - $165,989
3,911,067
kWh
$702,353
172,993
MMBtu
$(-14,399)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Ancillary Material Cost Electricity Usage Natural Gas Ancillary Material Cost