Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Alabama |
---|---|
Assessment Year | 2020 |
Principal Product | Joists and Decking for Metal Buildings |
NAICS | 332312 - Fabricated Structural Metal Manufacturing |
SIC | 3441 - Fabricated Structural Metal |
Sales | $100,000,000-$500,000,000 |
# of Employees | 288 |
Plant Area (Sq.Ft.) | 486,400 |
Annual Production | 150,000 Tons |
Production Hrs. Annual | 7,500 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $485,706 | 7,959,600 | kWh | $0.06 |
Electricity Demand | $407,835 | 33,408 | kW-months/year | $12.21 |
Electricity Fees | $(-102,624) | - | $ | - |
Natural Gas | $321,436 | 28,782 | MMBtu | $11.17 |
TOTAL ENERGY COSTS | $1,112,353 | |||
RECOMMENDED SAVINGS* | $117,945 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $6,594 Cost: $700 |
$2,728 | 44,703 | - | - | $(-313) | - | $4,179 | 374 |
$2,728 44,703 kWh |
- - kW-months/year |
$(-313) - $ |
$4,179 374 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,693 Cost: $100 |
$3,018 | 49,452 | $2,284 | 187 | $(-609) | - | - | - |
$3,018 49,452 kWh |
$2,284 187 kW-months/year |
$(-609) - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $21,587 Cost: $2,185 |
$16,977 | 278,213 | $7,412 | 607 | $(-2,802) | - | - | - |
$16,977 278,213 kWh |
$7,412 607 kW-months/year |
$(-2,802) - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $84,652 Cost: $115,026 |
$63,384 | 1,038,744 | $32,257 | 2,642 | $(-10,989) | - | - | - |
$63,384 1,038,744 kWh |
$32,257 2,642 kW-months/year |
$(-10,989) - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $419 Cost: $1,016 |
$259 | 4,251 | $214 | 18 | $(-54) | - | - | - |
$259 4,251 kWh |
$214 18 kW-months/year |
$(-54) - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $117,945 Cost: $119,027 |
$86,366 | 1,415,363 | $42,167 | 3,454 | $(-14,767) | - | $4,179 | 374 | $86,366 1,415,363 kWh |
$42,167 3,454 kW-months/year |
$(-14,767) - $ |
$4,179 374 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas |