Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Alabama |
---|---|
Assessment Year | 2020 |
Principal Product | Automotive Metal Parts |
NAICS | 336370 - Motor Vehicle Metal Stamping |
SIC | 3465 - Automotive Stampings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 220 |
Plant Area (Sq.Ft.) | 197,056 |
Annual Production | 36,000,000 Pounds |
Production Hrs. Annual | 4,160 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $515,943 | 8,318,676 | kWh | $0.06 |
Electricity Demand | $111,769 | 20,240 | kW-months/year | $5.52 |
Electricity Fees | $65,347 | - | $ | - |
TOTAL ENERGY COSTS | $693,059 | |||
RECOMMENDED SAVINGS* | $111,457 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $42,759 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Electricity Usage | Electricity Demand | Electricity Fees | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $32,232 Cost: $92,405 |
$23,224 | 374,459 | $5,969 | 1,081 | $3,039 | - |
$23,224 374,459 kWh |
$5,969 1,081 kW-months/year |
$3,039 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $12,593 Cost: $6,955 |
- | - | $11,406 | 2,066 | $1,187 | - |
- - kWh |
$11,406 2,066 kW-months/year |
$1,187 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.8112 COMBINE UTILITY METERS |
Savings: $26,371 Cost: $60,000 |
- | - | - | - | $26,371 | - |
- - kWh |
- - kW-months/year |
$26,371 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $10,527 Cost: $7,775 |
$8,518 | 137,340 | $1,016 | 184 | $993 | - |
$8,518 137,340 kWh |
$1,016 184 kW-months/year |
$993 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $7,178 Cost: $50 |
$5,733 | 92,438 | $768 | 139 | $677 | - |
$5,733 92,438 kWh |
$768 139 kW-months/year |
$677 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $22,556 Cost: $500 |
$20,429 | 329,389 | - | - | $2,127 | - |
$20,429 329,389 kWh |
- - kW-months/year |
$2,127 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $111,457 Cost: $167,685 |
$57,904 | 933,626 | $19,159 | 3,470 | $34,394 | - | $57,904 933,626 kWh |
$19,159 3,470 kW-months/year |
$34,394 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $42,759 Cost: $100,180 |
$31,742 | 511,799 | $6,985 | 1,265 | $4,032 | - | $31,742 511,799 kWh |
$6,985 1,265 kW-months/year |
$4,032 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Electricity Usage | Electricity Demand | Electricity Fees |