Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Alabama |
---|---|
Assessment Year | 2020 |
Principal Product | Hardwood Flooring |
NAICS | 321912 - Cut Stock, Resawing Lumber, and Planing |
SIC | 2426 - Hardwood Dimension & Flooring Mills |
Sales | $10,000,000-$50,000,000 |
# of Employees | 105 |
Plant Area (Sq.Ft.) | 178,580 |
Annual Production | 806,000 Units |
Production Hrs. Annual | 4,725 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $382,787 | 4,743,103 | kWh | $0.08 |
Electricity Fees | $(-9,997) | - | $ | - |
Wood | $232,102 | 200,088 | MMBtu | $1.16 |
TOTAL ENERGY COSTS | $604,892 | |||
RECOMMENDED SAVINGS* | $261,257 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,361 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Wood | Administrative Changes | Electricity Usage | Electricity Fees | Wood | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT |
Savings: $219,577 Cost: $400 |
$248,548 | 3,079,747 | $(-7,335) | - | $(-21,636) | (-18,727) | - | - |
$248,548 3,079,747 kWh |
$(-7,335) - $ |
$(-21,636) (-18,727) MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $15,587 Cost: $42,000 |
- | - | - | - | $15,587 | 13,437 | - | - |
- - kWh |
- - $ |
$15,587 13,437 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.454 MODIFY STARTUP/SHUTDOWN TIMES |
Savings: $15,732 Cost: $150 |
- | - | $(-478) | - | - | - | $16,210 | - |
- - kWh |
$(-478) - $ |
- - MMBtu |
$16,210 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,733 Cost: $50 |
$4,877 | 60,442 | $(-144) | - | - | - | - | - |
$4,877 60,442 kWh |
$(-144) - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,464 Cost: $2,170 |
$3,569 | 44,228 | $(-105) | - | - | - | - | - |
$3,569 44,228 kWh |
$(-105) - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,164 Cost: $309 |
$2,230 | 27,634 | $(-66) | - | - | - | - | - |
$2,230 27,634 kWh |
$(-66) - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $261,257 Cost: $45,079 |
$259,224 | 3,212,051 | $(-8,128) | - | $(-6,049) | (-5,290) | $16,210 | - | $259,224 3,212,051 kWh |
$(-8,128) - $ |
$(-6,049) (-5,290) MMBtu |
$16,210 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,361 Cost: $2,529 |
$10,676 | 132,304 | $(-315) | - | - | - | - | - | $10,676 132,304 kWh |
$(-315) - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Wood | Administrative Changes | Electricity Usage | Electricity Fees | Wood | Administrative Changes |