Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Alabama |
---|---|
Assessment Year | 2020 |
Principal Product | Metal Parts |
NAICS | 332710 - Machine Shops |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 65 |
Plant Area (Sq.Ft.) | 85,280 |
Annual Production | 1,000,000 Pieces |
Production Hrs. Annual | 4,940 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $100,104 | 1,426,200 | kWh | $0.07 |
Electricity Demand | $71,278 | 5,455 | kW-months/year | $13.07 |
Electricity Fees | $21,168 | - | $ | - |
Natural Gas | $4,668 | 394 | MMBtu | $11.85 |
TOTAL ENERGY COSTS | $197,218 | |||
RECOMMENDED SAVINGS* | $64,633 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,371 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Electricity Usage | Electricity Demand | Electricity Fees | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $37,963 Cost: $29,625 |
$23,272 | 331,563 | $10,518 | 805 | $4,173 | - |
$23,272 331,563 kWh |
$10,518 805 kW-months/year |
$4,173 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $538 Cost: $121 |
$479 | 6,828 | - | - | $59 | - |
$479 6,828 kWh |
- - kW-months/year |
$59 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $17,318 Cost: $21,905 |
$9,506 | 135,432 | $5,908 | 452 | $1,904 | - |
$9,506 135,432 kWh |
$5,908 452 kW-months/year |
$1,904 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS |
Savings: $3,981 Cost: $17,881 |
$(-784) | (-11,169) | - | - | $4,765 | - |
$(-784) (-11,169) kWh |
- - kW-months/year |
$4,765 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,885 Cost: $500 |
$1,208 | 17,215 | $470 | 36 | $207 | - |
$1,208 17,215 kWh |
$470 36 kW-months/year |
$207 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,948 Cost: $4,200 |
$2,044 | 29,127 | $580 | 44 | $324 | - |
$2,044 29,127 kWh |
$580 44 kW-months/year |
$324 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $64,633 Cost: $74,232 |
$35,725 | 508,996 | $17,476 | 1,337 | $11,432 | - | $35,725 508,996 kWh |
$17,476 1,337 kW-months/year |
$11,432 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,371 Cost: $4,821 |
$3,731 | 53,170 | $1,050 | 80 | $590 | - | $3,731 53,170 kWh |
$1,050 80 kW-months/year |
$590 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Electricity Usage | Electricity Demand | Electricity Fees |