IAC logo
IAC Assessment: UA0233
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0233
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2020
Principal Product Beer and Spirits
NAICS 312120 - Breweries
SIC 2082 - Malt Beverages
Sales $1,000,000-$5,000,000
# of Employees 22
Plant Area (Sq.Ft.) 8,500
Annual Production 200 Thousand Gallons
Production Hrs. Annual 2,000
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $69,244 647,640 kWh $0.11
Electricity Demand $7,432 1,894 kW-months/year $3.92
Electricity Fees $9,441 - $ -
Natural Gas $22,395 1,908 MMBtu $11.74
TOTAL ENERGY COSTS $108,512
RECOMMENDED SAVINGS* $21,467 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,266
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees By-product Production Electricity Usage Electricity Demand Electricity Fees By-product Production
$ kWh $ kW-months/year $ $ $ $
01: 3.5317 SELL / OFFER BY-PRODUCT AS ANIMAL FEED Savings:
$16,058
Cost:
$600
- - - - - - $16,058 - -
-
kWh
-
-
kW-months/year
-
-
$
$16,058
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$848
Cost:
$50
$727 6,805 $37 9 $84 - - - $727
6,805
kWh
$37
9
kW-months/year
$84
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$260
Cost:
$1,068
$223 2,092 $11 3 $26 - - - $223
2,092
kWh
$11
3
kW-months/year
$26
-
$
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$3,500
Cost:
$20
$3,154 29,500 - - $346 - - - $3,154
29,500
kWh
-
-
kW-months/year
$346
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$658
Cost:
$185
$593 5,550 - - $65 - - - $593
5,550
kWh
-
-
kW-months/year
$65
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$104
Cost:
$830
$78 734 $16 4 $10 - - - $78
734
kWh
$16
4
kW-months/year
$10
-
$
-
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$39
Cost:
$25
$35 332 - - $4 - - - $35
332
kWh
-
-
kW-months/year
$4
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$21,467
Cost:
$2,778
$4,810 45,013 $64 16 $535 - $16,058 - $4,810
45,013
kWh
$64
16
kW-months/year
$535
-
$
$16,058
-
$
TOTAL IMPLEMENTED Savings:
$5,266
Cost:
$1,323
$4,697 43,947 $48 12 $521 - - - $4,697
43,947
kWh
$48
12
kW-months/year
$521
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees By-product Production Electricity Usage Electricity Demand Electricity Fees By-product Production