IAC logo
IAC Assessment: UA0244
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0244
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2021
Principal Product Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 10
Plant Area (Sq.Ft.) 850,000
Annual Production 5,700,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $866,134 14,146,758 kWh $0.06
Electricity Demand $125,248 25,603 kW-months/year $4.89
Electricity Fees $(-56,622) - $ -
TOTAL ENERGY COSTS $934,760
RECOMMENDED SAVINGS* $460,118 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,477
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,477
Cost:
$3,209
$3,321 54,242 $367 75 $(-211) - - - - - $3,321
54,242
kWh
$367
75
kW-months/year
$(-211)
-
$
-
-
$
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$893
Cost:
$282
$947 15,474 - - $(-54) - - - - - $947
15,474
kWh
-
-
kW-months/year
$(-54)
-
$
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$54,839
Cost:
$180,000
$58,159 950,000 - - $(-3,320) - - - - - $58,159
950,000
kWh
-
-
kW-months/year
$(-3,320)
-
$
-
-
$
-
-
$
04: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$283,379
Cost:
$2,501,328
$398,998 6,517,440 $43,676 8,928 $(-25,277) - $(-134,018) - - - $398,998
6,517,440
kWh
$43,676
8,928
kW-months/year
$(-25,277)
-
$
$(-134,018)
-
$
-
-
$
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$117,530
Cost:
$1,000
- - - - - - - - $117,530 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$117,530
-
$
TOTAL RECOMMENDED Savings:
$460,118
Cost:
$2,685,819
$461,425 7,537,156 $44,043 9,003 $(-28,862) - $(-134,018) - $117,530 - $461,425
7,537,156
kWh
$44,043
9,003
kW-months/year
$(-28,862)
-
$
$(-134,018)
-
$
$117,530
-
$
TOTAL IMPLEMENTED Savings:
$3,477
Cost:
$3,209
$3,321 54,242 $367 75 $(-211) - - - - - $3,321
54,242
kWh
$367
75
kW-months/year
$(-211)
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes One-time Revenue or Avoided Cost