Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2022
Principal Product Car Carpets and Plastics
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $1,000,000-$5,000,000
# of Employees 320
Plant Area (Sq.Ft.) 261,000
Annual Production 4,100,000 Units
Production Hrs. Annual 6,578
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,082,198 14,370,409 kWh $0.08
Electricity Demand $20,638 3,800 kW-months/year $5.43
Electricity Fees $114,279 - $ -
Natural Gas $85,721 6,149 MMBtu $13.94
TOTAL ENERGY COSTS $1,302,836
RECOMMENDED SAVINGS* $128,710 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $125,137
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$89,160
Cost:
$80,028
$70,954 942,161 $9,836 1,811 $8,370 - - - $70,954
942,161
kWh
$9,836
1,811
kW-months/year
$8,370
-
$
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,505
Cost:
$1,000
$7,295 96,868 $1,318 243 $892 - - - $7,295
96,868
kWh
$1,318
243
kW-months/year
$892
-
$
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,741
Cost:
$8,591
$7,022 93,240 $3,617 666 $1,102 - - - $7,022
93,240
kWh
$3,617
666
kW-months/year
$1,102
-
$
-
-
MMBtu
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$14,731
Cost:
$150
$448 5,953 - - $46 - $14,237 1,022 $448
5,953
kWh
-
-
kW-months/year
$46
-
$
$14,237
1,022
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,573
Cost:
$5,533
$2,947 39,133 $291 54 $335 - - - $2,947
39,133
kWh
$291
54
kW-months/year
$335
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$128,710
Cost:
$95,302
$88,666 1,177,355 $15,062 2,774 $10,745 - $14,237 1,022 $88,666
1,177,355
kWh
$15,062
2,774
kW-months/year
$10,745
-
$
$14,237
1,022
MMBtu
TOTAL IMPLEMENTED Savings:
$125,137
Cost:
$89,769
$85,719 1,138,222 $14,771 2,720 $10,410 - $14,237 1,022 $85,719
1,138,222
kWh
$14,771
2,720
kW-months/year
$10,410
-
$
$14,237
1,022
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas