IAC logo
IAC Assessment: UA0261
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0261
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2022
Principal Product Steel Sheet
NAICS 332322 - Sheet Metal Work Manufacturing
SIC 3444 - Sheet Metalwork
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 85,400
Annual Production 12,201,411 Units
Production Hrs. Annual 6,000
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $156,646 5,163,200 kWh $0.03
Electricity Demand $36,586 5,570 kW-months/year $6.57
Electricity Fees $36,582 - $ -
Natural Gas $22,718 1,876 MMBtu $12.11
TOTAL ENERGY COSTS $252,532
RECOMMENDED SAVINGS* $50,682 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,987
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$14,348
Cost:
$2,201
$12,064 397,637 - - $2,284 - $12,064
397,637
kWh
-
-
kW-months/year
$2,284
-
$
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$21,987
Cost:
$82,172
$14,260 470,030 $4,227 644 $3,500 - $14,260
470,030
kWh
$4,227
644
kW-months/year
$3,500
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$477
Cost:
$500
$275 9,054 $126 19 $76 - $275
9,054
kWh
$126
19
kW-months/year
$76
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$10,151
Cost:
$2,946
- - - - $10,151 - -
-
kWh
-
-
kW-months/year
$10,151
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,719
Cost:
$7,168
$2,182 71,928 $945 144 $592 - $2,182
71,928
kWh
$945
144
kW-months/year
$592
-
$
TOTAL RECOMMENDED Savings:
$50,682
Cost:
$94,987
$28,781 948,649 $5,298 807 $16,603 - $28,781
948,649
kWh
$5,298
807
kW-months/year
$16,603
-
$
TOTAL IMPLEMENTED Savings:
$21,987
Cost:
$82,172
$14,260 470,030 $4,227 644 $3,500 - $14,260
470,030
kWh
$4,227
644
kW-months/year
$3,500
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees