IAC logo
IAC Assessment: UA0262
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0262
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2022
Principal Product Automotive Trim
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 325
Plant Area (Sq.Ft.) 293,000
Annual Production 3,000,000 Units
Production Hrs. Annual 6,336
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $767,332 13,235,611 kWh $0.06
Electricity Demand $122,149 29,821 kW-months/year $4.10
Electricity Fees $71,163 - $ -
Natural Gas $1,836 124 MMBtu $14.81
TOTAL ENERGY COSTS $962,480
RECOMMENDED SAVINGS* $59,736 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $52,826
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$46,023
Cost:
$44,464
$37,494 646,789 $5,120 1,225 $3,409 - $37,494
646,789
kWh
$5,120
1,225
kW-months/year
$3,409
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,699
Cost:
$2,060
$2,499 43,110 - - $200 - $2,499
43,110
kWh
-
-
kW-months/year
$200
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,104
Cost:
$4,929
$3,470 59,865 $330 79 $304 - $3,470
59,865
kWh
$330
79
kW-months/year
$304
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,910
Cost:
$400
$5,767 99,475 $631 151 $512 - $5,767
99,475
kWh
$631
151
kW-months/year
$512
-
$
TOTAL RECOMMENDED Savings:
$59,736
Cost:
$51,853
$49,230 849,239 $6,081 1,455 $4,425 - $49,230
849,239
kWh
$6,081
1,455
kW-months/year
$4,425
-
$
TOTAL IMPLEMENTED Savings:
$52,826
Cost:
$51,453
$43,463 749,764 $5,450 1,304 $3,913 - $43,463
749,764
kWh
$5,450
1,304
kW-months/year
$3,913
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees