Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Alabama |
---|---|
Assessment Year | 2022 |
Principal Product | Wooden doors |
NAICS | 321911 - Wood Window and Door Manufacturing |
SIC | 2431 - Millwork |
Sales | $50,000,000-$100,000,000 |
# of Employees | 289 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 3,380,000 Units |
Production Hrs. Annual | 6,318 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $310,812 | 3,844,916 | kWh | $0.08 |
Electricity Fees | $32,014 | - | $ | - |
Natural Gas | $50,196 | 6,134 | MMBtu | $8.18 |
TOTAL ENERGY COSTS | $393,022 | |||
RECOMMENDED SAVINGS* | $43,285 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $36,735 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Electricity Usage | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $14,745 Cost: $4,870 |
$13,368 | 165,366 | $1,377 | - | - | - |
$13,368 165,366 kWh |
$1,377 - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $9,878 Cost: $500 |
$8,956 | 110,788 | $922 | - | - | - |
$8,956 110,788 kWh |
$922 - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $9,549 Cost: $8,397 |
- | - | - | - | $9,549 | 1,167 |
- - kWh |
- - $ |
$9,549 1,167 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,563 Cost: $1,200 |
$2,324 | 28,747 | $239 | - | - | - |
$2,324 28,747 kWh |
$239 - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $5,008 Cost: $3,605 |
$4,540 | 56,164 | $468 | - | - | - |
$4,540 56,164 kWh |
$468 - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,542 Cost: $1,512 |
$1,398 | 17,296 | $144 | - | - | - |
$1,398 17,296 kWh |
$144 - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $43,285 Cost: $20,084 |
$30,586 | 378,361 | $3,150 | - | $9,549 | 1,167 | $30,586 378,361 kWh |
$3,150 - $ |
$9,549 1,167 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $36,735 Cost: $14,967 |
$24,648 | 304,901 | $2,538 | - | $9,549 | 1,167 | $24,648 304,901 kWh |
$2,538 - $ |
$9,549 1,167 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Electricity Usage | Electricity Fees | Natural Gas |