IAC Assessment: UA0268
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0268
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2022
Principal Product Dump Body
NAICS 336211 - Motor Vehicle Body Manufacturing
SIC 3713 - Truck And Bus Bodies
Sales $50,000,000-$100,000,000
# of Employees 176
Plant Area (Sq.Ft.) 177,000
Annual Production 2,000 Units
Production Hrs. Annual 3,003
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $191,626 2,019,689 kWh $0.09
Electricity Demand $51,713 7,194 kW-months/year $7.19
Electricity Fees $14,771 - $ -
Natural Gas $129,407 9,924 MMBtu $13.04
TOTAL ENERGY COSTS $387,517
RECOMMENDED SAVINGS* $46,587 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,807
Cost:
$1,000
$4,509 47,516 $966 134 $332 - - - $4,509
47,516
kWh
$966
134
kW-months/year
$332
-
$
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,641
Cost:
$9,092
$5,467 57,604 $794 110 $380 - - - $5,467
57,604
kWh
$794
110
kW-months/year
$380
-
$
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,098
Cost:
$8,397
- - - - - - $4,098 314 -
-
kWh
-
-
kW-months/year
-
-
$
$4,098
314
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$668
Cost:
$557
$630 6,642 - - $38 - - - $630
6,642
kWh
-
-
kW-months/year
$38
-
$
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,089
Cost:
$17,628
$6,539 68,903 $1,979 275 $571 - - - $6,539
68,903
kWh
$1,979
275
kW-months/year
$571
-
$
-
-
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,836
Cost:
$1,190
$1,731 18,233 - - $105 - - - $1,731
18,233
kWh
-
-
kW-months/year
$105
-
$
-
-
MMBtu
07: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$18,030
Cost:
$20,167
- - - - - - $18,030 1,383 -
-
kWh
-
-
kW-months/year
-
-
$
$18,030
1,383
MMBtu
08: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$418
Cost:
$1,048
- - - - - - $418 32 -
-
kWh
-
-
kW-months/year
-
-
$
$418
32
MMBtu
TOTAL RECOMMENDED Savings:
$46,587
Cost:
$59,079
$18,876 198,898 $3,739 519 $1,426 - $22,546 1,729 $18,876
198,898
kWh
$3,739
519
kW-months/year
$1,426
-
$
$22,546
1,729
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas