IAC Assessment: UA0269
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0269
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2023
Principal Product Asphalt
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $5,000,000-$10,000,000
# of Employees 28
Plant Area (Sq.Ft.) 827,640
Annual Production 260,000 Tons
Production Hrs. Annual 8,736
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $269,436 2,252,096 kWh $0.12
Electricity Demand $20,785 4,385 kW-months/year $4.74
Electricity Fees $16,291 - $ -
Natural Gas $1,550,711 190,962 MMBtu $8.12
TOTAL ENERGY COSTS $1,857,223
RECOMMENDED SAVINGS* $179,443 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$147,247
Cost:
$186,762
- - - - - - $147,247 18,134 - - -
-
kWh
-
-
kW-months/year
-
-
$
$147,247
18,134
MMBtu
-
-
$
02: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$21,248
Cost:
$98,929
- - - - - - $21,248 2,617 - - -
-
kWh
-
-
kW-months/year
-
-
$
$21,248
2,617
MMBtu
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,634
Cost:
$842
- - $3,441 726 $193 - - - - - -
-
kWh
$3,441
726
kW-months/year
$193
-
$
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,902
Cost:
$3,140
$1,708 14,277 $93 20 $101 - - - - - $1,708
14,277
kWh
$93
20
kW-months/year
$101
-
$
-
-
MMBtu
-
-
$
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$2,019
Cost:
$2,438
$1,912 15,983 - - $107 - - - - - $1,912
15,983
kWh
-
-
kW-months/year
$107
-
$
-
-
MMBtu
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,642
Cost:
$297
$2,502 20,919 - - $140 - - - - - $2,502
20,919
kWh
-
-
kW-months/year
$140
-
$
-
-
MMBtu
-
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$751
Cost:
$251
- - - - - - - - $751 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$751
-
$
TOTAL RECOMMENDED Savings:
$179,443
Cost:
$292,659
$6,122 51,179 $3,534 746 $541 - $168,495 20,751 $751 - $6,122
51,179
kWh
$3,534
746
kW-months/year
$541
-
$
$168,495
20,751
MMBtu
$751
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes