IAC logo
IAC Assessment: UA0275
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0275
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2023
Principal Product Plastics
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $5,000,000-$10,000,000
# of Employees 12
Plant Area (Sq.Ft.) 80,000
Annual Production 4,500,000 Pounds
Production Hrs. Annual 2,210
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,805 297,780 kWh $0.11
Electricity Demand $25,956 2,451 kW-months/year $10.59
Natural Gas $1,354 67 MMBtu $20.21
LPG $12,218 408 MMBtu $29.95
TOTAL ENERGY COSTS $207,341
RECOMMENDED SAVINGS* $7,759 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,032
Cost:
$377
$1,920 17,981 - - $112 - $1,920
17,981
kWh
-
-
kW-months/year
$112
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,695
Cost:
$11,361
$1,651 15,458 $890 84 $154 - $1,651
15,458
kWh
$890
84
kW-months/year
$154
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,448
Cost:
$4,532
$970 9,078 $395 37 $83 - $970
9,078
kWh
$395
37
kW-months/year
$83
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$824
Cost:
$227
$777 7,279 - - $47 - $777
7,279
kWh
-
-
kW-months/year
$47
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$760
Cost:
$310
$278 2,603 $439 41 $43 - $278
2,603
kWh
$439
41
kW-months/year
$43
-
$
TOTAL RECOMMENDED Savings:
$7,759
Cost:
$16,807
$5,596 52,399 $1,724 162 $439 - $5,596
52,399
kWh
$1,724
162
kW-months/year
$439
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees