IAC Assessment: UA0289
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UA0289
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Alabama
Assessment Year 2024
Principal Product Automotive Parts
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 155
Plant Area (Sq.Ft.) 250,000
Annual Production 5,500,000 Units
Production Hrs. Annual 5,760
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $754,939 9,345,987 kWh $0.08
Electricity Demand $109,414 22,031 kW-months/year $4.97
Electricity Fees $43,109 - $ -
Natural Gas $228,495 25,640 MMBtu $8.91
TOTAL ENERGY COSTS $1,135,957
RECOMMENDED SAVINGS* $665,274 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$330,998
Cost:
$8,608,788
$307,928 3,810,985 $7,335 1,476 $15,735 - - - $307,928
3,810,985
kWh
$7,335
1,476
kW-months/year
$15,735
-
$
-
-
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,141
Cost:
$6,733
- - - - $6,141 - - - -
-
kWh
-
-
kW-months/year
$6,141
-
$
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$19,427
Cost:
$1,000
$16,614 205,618 $1,889 380 $924 - - - $16,614
205,618
kWh
$1,889
380
kW-months/year
$924
-
$
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$26,555
Cost:
$8,591
$23,245 287,690 $2,048 412 $1,262 - - - $23,245
287,690
kWh
$2,048
412
kW-months/year
$1,262
-
$
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,789
Cost:
$22,563
- - - - - - $3,789 425 -
-
kWh
-
-
kW-months/year
-
-
$
$3,789
425
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,369
Cost:
$17,266
$4,294 53,145 $820 165 $255 - - - $4,294
53,145
kWh
$820
165
kW-months/year
$255
-
$
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,334
Cost:
$6,800
$4,128 51,094 - - $206 - - - $4,128
51,094
kWh
-
-
kW-months/year
$206
-
$
-
-
MMBtu
08: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$218,857
Cost:
$1,056,464
$174,381 2,158,181 $34,074 6,856 $10,402 - - - $174,381
2,158,181
kWh
$34,074
6,856
kW-months/year
$10,402
-
$
-
-
MMBtu
09: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$48,585
Cost:
$5,495
$46,276 572,726 - - $2,309 - - - $46,276
572,726
kWh
-
-
kW-months/year
$2,309
-
$
-
-
MMBtu
10: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,219
Cost:
$79
$1,161 14,374 - - $58 - - - $1,161
14,374
kWh
-
-
kW-months/year
$58
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$665,274
Cost:
$9,733,779
$578,027 7,153,813 $46,166 9,289 $37,292 - $3,789 425 $578,027
7,153,813
kWh
$46,166
9,289
kW-months/year
$37,292
-
$
$3,789
425
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas