IAC logo
IAC Assessment: UC2302
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UC2302
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Connecticut
Assessment Year 2023
Principal Product Aerospace component manufacturing
NAICS 333318 - Other Commercial and Service Industry Machinery Manufacturing
SIC 3599 - Industrial Machinery, Nec
Sales $1,000,000-$5,000,000
# of Employees 15
Plant Area (Sq.Ft.) 19,000
Annual Production 20,000 Units
Production Hrs. Annual 2,000
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $51,656 476,229 kWh $0.11
Electricity Demand $22,494 1,870 kW-months/year $12.03
Electricity Fees $32,649 - $ -
Natural Gas $2,354 139 MMBtu $16.95
TOTAL ENERGY COSTS $109,153
RECOMMENDED SAVINGS* $20,515 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$19
Cost:
-
- - - - $19 - - - - - -
-
kWh
-
-
kW-months/year
$19
-
$
-
-
$
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$519
Cost:
-
- - - - $519 - - - - - -
-
kWh
-
-
kW-months/year
$519
-
$
-
-
$
-
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$555
Cost:
$540
- - - - $555 - - - - - -
-
kWh
-
-
kW-months/year
$555
-
$
-
-
$
-
-
$
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$836
Cost:
-
- - - - $836 - - - - - -
-
kWh
-
-
kW-months/year
$836
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,546
Cost:
$3,714
$905 8,344 $602 50 - - $40 - $(-1) - $905
8,344
kWh
$602
50
kW-months/year
-
-
$
$40
-
$
$(-1)
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$136
Cost:
$461
$74 685 $49 4 - - $7 - $5 - $74
685
kWh
$49
4
kW-months/year
-
-
$
$7
-
$
$5
-
$
07: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,091
Cost:
$431
$2,091 19,277 - - - - - - - - $2,091
19,277
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,690
Cost:
$2,800
$1,203 11,089 $488 40 - - - - - - $1,203
11,089
kWh
$488
40
kW-months/year
-
-
$
-
-
$
-
-
$
09: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$13,123
Cost:
$2,864
$9,355 86,244 $3,768 313 - - - - - - $9,355
86,244
kWh
$3,768
313
kW-months/year
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$20,515
Cost:
$10,810
$13,628 125,639 $4,906 408 $1,929 - $47 - $4 - $13,628
125,639
kWh
$4,906
408
kW-months/year
$1,929
-
$
$47
-
$
$4
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Ancillary Material Cost