Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Connecticut |
---|---|
Assessment Year | 2023 |
Principal Product | Injection molds and composite parts |
NAICS | 332710 - Machine Shops |
SIC | 3544 - Special Dies, Tools, Jigs & Fixtures |
Sales | $5,000,000-$10,000,000 |
# of Employees | 40 |
Plant Area (Sq.Ft.) | 11,880 |
Annual Production | 20,000 Units |
Production Hrs. Annual | 2,000 |
Location (State) | CT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $63,776 | 674,688 | kWh | $0.09 |
Electricity Demand | $37,095 | 1,759 | kW-months/year | $21.09 |
Electricity Fees | $(-172) | - | $ | - |
Natural Gas | $1,948 | 109 | MMBtu | $17.90 |
TOTAL ENERGY COSTS | $102,647 | |||
RECOMMENDED SAVINGS* | $86,718 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $284 Cost: $500 |
$284 | 3,004 | - | - | - | - | - | - | - | - |
$284 3,004 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $115 Cost: $696 |
$60 | 634 | $55 | 3 | - | - | - | - | - | - |
$60 634 kWh |
$55 3 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $870 Cost: $2,800 |
$666 | 7,050 | $204 | 10 | - | - | - | - | - | - |
$666 7,050 kWh |
$204 10 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $1,129 Cost: $500 |
$1,129 | 11,943 | - | - | - | - | - | - | - | - |
$1,129 11,943 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $16,066 Cost: $176,604 |
$922 | 9,750 | $4,218 | 200 | $13,050 | - | $(-2,124) | (-119) | - | - |
$922 9,750 kWh |
$4,218 200 kW-months/year |
$13,050 - $ |
$(-2,124) (-119) MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $6,257 Cost: $36,220 |
$3,533 | 37,379 | $2,723 | 129 | - | - | - | - | - | - |
$3,533 37,379 kWh |
$2,723 129 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $47,312 Cost: $455,896 |
$54,904 | 580,990 | - | - | - | - | - | - | $(-7,592) | - |
$54,904 580,990 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$(-7,592) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING |
Savings: $3,229 Cost: $13,224 |
$275 | 2,912 | $485 | 23 | $521 | - | $1,948 | 109 | - | - |
$275 2,912 kWh |
$485 23 kW-months/year |
$521 - $ |
$1,948 109 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL |
Savings: $11,455 Cost: $55,867 |
$(-77) | (-810) | $2,782 | 132 | $8,750 | - | - | - | - | - |
$(-77) (-810) kWh |
$2,782 132 kW-months/year |
$8,750 - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $86,718 Cost: $742,307 |
$61,697 | 652,851 | $10,468 | 496 | $22,321 | - | $(-176) | (-10) | $(-7,592) | - | $61,697 652,851 kWh |
$10,468 496 kW-months/year |
$22,321 - $ |
$(-176) (-10) MMBtu |
$(-7,592) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Personnel Changes |