IAC logo
IAC Assessment: UC2303
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UC2303
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Connecticut
Assessment Year 2023
Principal Product Injection molds and composite parts
NAICS 332710 - Machine Shops
SIC 3544 - Special Dies, Tools, Jigs & Fixtures
Sales $5,000,000-$10,000,000
# of Employees 40
Plant Area (Sq.Ft.) 11,880
Annual Production 20,000 Units
Production Hrs. Annual 2,000
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $63,776 674,688 kWh $0.09
Electricity Demand $37,095 1,759 kW-months/year $21.09
Electricity Fees $(-172) - $ -
Natural Gas $1,948 109 MMBtu $17.90
TOTAL ENERGY COSTS $102,647
RECOMMENDED SAVINGS* $86,718 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$284
Cost:
$500
$284 3,004 - - - - - - - - $284
3,004
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$115
Cost:
$696
$60 634 $55 3 - - - - - - $60
634
kWh
$55
3
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$870
Cost:
$2,800
$666 7,050 $204 10 - - - - - - $666
7,050
kWh
$204
10
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,129
Cost:
$500
$1,129 11,943 - - - - - - - - $1,129
11,943
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$16,066
Cost:
$176,604
$922 9,750 $4,218 200 $13,050 - $(-2,124) (-119) - - $922
9,750
kWh
$4,218
200
kW-months/year
$13,050
-
$
$(-2,124)
(-119)
MMBtu
-
-
$
06: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$6,257
Cost:
$36,220
$3,533 37,379 $2,723 129 - - - - - - $3,533
37,379
kWh
$2,723
129
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$47,312
Cost:
$455,896
$54,904 580,990 - - - - - - $(-7,592) - $54,904
580,990
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$(-7,592)
-
$
08: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$3,229
Cost:
$13,224
$275 2,912 $485 23 $521 - $1,948 109 - - $275
2,912
kWh
$485
23
kW-months/year
$521
-
$
$1,948
109
MMBtu
-
-
$
09: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$11,455
Cost:
$55,867
$(-77) (-810) $2,782 132 $8,750 - - - - - $(-77)
(-810)
kWh
$2,782
132
kW-months/year
$8,750
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$86,718
Cost:
$742,307
$61,697 652,851 $10,468 496 $22,321 - $(-176) (-10) $(-7,592) - $61,697
652,851
kWh
$10,468
496
kW-months/year
$22,321
-
$
$(-176)
(-10)
MMBtu
$(-7,592)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes