IAC Assessment: UC2304
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UC2304
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Connecticut
Assessment Year 2023
Principal Product Steel frames
NAICS 332312 - Fabricated Structural Metal Manufacturing
SIC 3441 - Fabricated Structural Metal
Sales $50,000,000-$100,000,000
# of Employees 61
Plant Area (Sq.Ft.) 125,000
Annual Production 8,000 Tons
Production Hrs. Annual 2,000
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $149,474 1,043,280 kWh $0.14
Electricity Demand $69,676 4,836 kW-months/year $14.41
Electricity Fees $16,064 - $ -
Natural Gas $65,879 6,292 MMBtu $10.47
TOTAL ENERGY COSTS $301,094
RECOMMENDED SAVINGS* $145,575 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,182
Cost:
$2,800
$831 5,800 $351 24 - - - - - - $831
5,800
kWh
$351
24
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,346
Cost:
$16,122
$(-5,294) (-36,950) $(-730) (-51) $7,370 704 - - - - $(-5,294)
(-36,950)
kWh
$(-730)
(-51)
kW-months/year
$7,370
704
MMBtu
-
-
$
-
-
$
03: 2.7235 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT Savings:
$38,532
Cost:
$50,758
- - - - $38,532 3,680 - - - - -
-
kWh
-
-
kW-months/year
$38,532
3,680
MMBtu
-
-
$
-
-
$
04: 2.7493 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES Savings:
$17,250
Cost:
$148,500
- - - - $17,250 1,648 - - - - -
-
kWh
-
-
kW-months/year
$17,250
1,648
MMBtu
-
-
$
-
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,740
Cost:
$26,230
$(-1,698) (-11,849) $(-234) (-16) $6,672 637 - - - - $(-1,698)
(-11,849)
kWh
$(-234)
(-16)
kW-months/year
$6,672
637
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,863
Cost:
$2,882
$1,740 12,143 $1,050 73 - - $45 - $28 - $1,740
12,143
kWh
$1,050
73
kW-months/year
-
-
MMBtu
$45
-
$
$28
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$99
Cost:
$260
$57 401 $35 2 - - $3 - $4 - $57
401
kWh
$35
2
kW-months/year
-
-
MMBtu
$3
-
$
$4
-
$
08: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$79,562
Cost:
$411,323
$87,787 612,610 - - - - $(-8,225) - - - $87,787
612,610
kWh
-
-
kW-months/year
-
-
MMBtu
$(-8,225)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$145,575
Cost:
$658,875
$83,424 582,155 $472 33 $69,824 6,669 $(-8,177) - $32 - $83,424
582,155
kWh
$472
33
kW-months/year
$69,824
6,669
MMBtu
$(-8,177)
-
$
$32
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost