Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Connecticut |
---|---|
Assessment Year | 2023 |
Principal Product | Steel frames |
NAICS | 332312 - Fabricated Structural Metal Manufacturing |
SIC | 3441 - Fabricated Structural Metal |
Sales | $50,000,000-$100,000,000 |
# of Employees | 61 |
Plant Area (Sq.Ft.) | 125,000 |
Annual Production | 8,000 Tons |
Production Hrs. Annual | 2,000 |
Location (State) | CT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $149,474 | 1,043,280 | kWh | $0.14 |
Electricity Demand | $69,676 | 4,836 | kW-months/year | $14.41 |
Electricity Fees | $16,064 | - | $ | - |
Natural Gas | $65,879 | 6,292 | MMBtu | $10.47 |
TOTAL ENERGY COSTS | $301,094 | |||
RECOMMENDED SAVINGS* | $145,575 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,182 Cost: $2,800 |
$831 | 5,800 | $351 | 24 | - | - | - | - | - | - |
$831 5,800 kWh |
$351 24 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $1,346 Cost: $16,122 |
$(-5,294) | (-36,950) | $(-730) | (-51) | $7,370 | 704 | - | - | - | - |
$(-5,294) (-36,950) kWh |
$(-730) (-51) kW-months/year |
$7,370 704 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7235 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT |
Savings: $38,532 Cost: $50,758 |
- | - | - | - | $38,532 | 3,680 | - | - | - | - |
- - kWh |
- - kW-months/year |
$38,532 3,680 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7493 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES |
Savings: $17,250 Cost: $148,500 |
- | - | - | - | $17,250 | 1,648 | - | - | - | - |
- - kWh |
- - kW-months/year |
$17,250 1,648 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $4,740 Cost: $26,230 |
$(-1,698) | (-11,849) | $(-234) | (-16) | $6,672 | 637 | - | - | - | - |
$(-1,698) (-11,849) kWh |
$(-234) (-16) kW-months/year |
$6,672 637 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,863 Cost: $2,882 |
$1,740 | 12,143 | $1,050 | 73 | - | - | $45 | - | $28 | - |
$1,740 12,143 kWh |
$1,050 73 kW-months/year |
- - MMBtu |
$45 - $ |
$28 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $99 Cost: $260 |
$57 | 401 | $35 | 2 | - | - | $3 | - | $4 | - |
$57 401 kWh |
$35 2 kW-months/year |
- - MMBtu |
$3 - $ |
$4 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $79,562 Cost: $411,323 |
$87,787 | 612,610 | - | - | - | - | $(-8,225) | - | - | - |
$87,787 612,610 kWh |
- - kW-months/year |
- - MMBtu |
$(-8,225) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $145,575 Cost: $658,875 |
$83,424 | 582,155 | $472 | 33 | $69,824 | 6,669 | $(-8,177) | - | $32 | - | $83,424 582,155 kWh |
$472 33 kW-months/year |
$69,824 6,669 MMBtu |
$(-8,177) - $ |
$32 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Ancillary Material Cost |