IAC logo
IAC Assessment: UC2311
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Connecticut
Assessment Year 2023
Principal Product Wood products
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 2,500,000
Annual Production 11,000 Thousand Feet
Production Hrs. Annual 2,100
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $150,426 2,183,424 kWh $0.07
Electricity Demand $203,272 8,501 kW-months/year $23.91
Electricity Fees $46,309 - $ -
LPG $7,957 372 MMBtu $21.39
Fuel Oil #2 $280,087 10,309 MMBtu $27.17
Other Gas $27,577 1,217 MMBtu $22.67
Other Energy $8,795 252 MMBtu $34.90
TOTAL ENERGY COSTS $724,422
RECOMMENDED SAVINGS* $230,973 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $71,402
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$287
Cost:
-
- - - - $287 - - - - - - - -
-
kWh
-
-
kW-months/year
$287
-
$
-
-
MMBtu
-
-
$
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$48,394
Cost:
$1,010
- - - - $48,394 - - - - - - - -
-
kWh
-
-
kW-months/year
$48,394
-
$
-
-
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,309
Cost:
$1,900
$1,565 22,714 $744 31 - - - - - - - - $1,565
22,714
kWh
$744
31
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$9,913
Cost:
$75
$6,718 97,518 $3,194 134 - - - - - - - - $6,718
97,518
kWh
$3,194
134
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$830
Cost:
$428
$563 8,165 $267 11 - - - - - - - - $563
8,165
kWh
$267
11
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$215
Cost:
$100
$215 3,115 - - - - - - - - - - $215
3,115
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$312
Cost:
-
$182 2,638 $180 8 - - - - - - $(-50) - $182
2,638
kWh
$180
8
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$(-50)
-
$
08: 2.1222 INSTALL TURBULATORS Savings:
$18,806
Cost:
$5,970
- - - - - - $18,806 692 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$18,806
692
MMBtu
-
-
$
-
-
$
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,022
Cost:
$4,212
- - - - - - $3,022 111 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,022
111
MMBtu
-
-
$
-
-
$
10: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,564
Cost:
$1,995
- - - - - - $2,564 94 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,564
94
MMBtu
-
-
$
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,083
Cost:
$4,561
$1,524 22,123 $2,539 106 - - - - $37 - $(-18) - $1,524
22,123
kWh
$2,539
106
kW-months/year
-
-
$
-
-
MMBtu
$37
-
$
$(-18)
-
$
12: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$95,417
Cost:
$1,401,053
$118,194 1,715,440 - - - - - - $(-22,777) - - - $118,194
1,715,440
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$(-22,777)
-
$
-
-
$
13: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$44,822
Cost:
$159,957
$(-4,402) (-63,890) $51,646 2,160 - - - - $(-2,421) - - - $(-4,402)
(-63,890)
kWh
$51,646
2,160
kW-months/year
-
-
$
-
-
MMBtu
$(-2,421)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$230,973
Cost:
$1,581,261
$124,558 1,807,824 $58,571 2,450 $48,681 - $24,391 898 $(-25,161) - $(-68) - $124,558
1,807,824
kWh
$58,571
2,450
kW-months/year
$48,681
-
$
$24,391
898
MMBtu
$(-25,161)
-
$
$(-68)
-
$
TOTAL IMPLEMENTED Savings:
$71,402
Cost:
$14,181
$10,370 150,520 $6,745 282 $48,681 - $5,586 206 $37 - $(-18) - $10,370
150,520
kWh
$6,745
282
kW-months/year
$48,681
-
$
$5,586
206
MMBtu
$37
-
$
$(-18)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Personnel Changes Ancillary Material Cost