IAC logo
IAC Assessment: UC2411
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UC2411
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Connecticut
Assessment Year 2024
Principal Product Printed circuit boards
NAICS 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 35,000
Annual Production 100,000 Units
Production Hrs. Annual 2,000
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,509 557,728 kWh $0.09
Electricity Demand $33,659 2,196 kW-months/year $15.33
Electricity Fees $6,376 - $ -
Natural Gas $15,674 1,353 MMBtu $11.58
TOTAL ENERGY COSTS $105,218
RECOMMENDED SAVINGS* $27,967 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$962
Cost:
-
- - - - $962 - - - - - -
-
kWh
-
-
kW-months/year
$962
-
$
-
-
MMBtu
-
-
$
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$78
Cost:
$100
$78 884 - - - - - - - - $78
884
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$23,268
Cost:
$223,076
$27,127 305,484 - - - - - - $(-3,859) - $27,127
305,484
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$(-3,859)
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,065
Cost:
$75
$861 9,697 $204 13 - - - - - - $861
9,697
kWh
$204
13
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$572
Cost:
$2,608
$572 6,439 - - - - - - - - $572
6,439
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$1,203
Cost:
$1,779
$833 9,376 $370 24 - - - - - - $833
9,376
kWh
$370
24
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$819
Cost:
$3,620
$73 819 - - - - $747 64 - - $73
819
kWh
-
-
kW-months/year
-
-
$
$747
64
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$27,967
Cost:
$231,258
$29,544 332,698 $574 37 $962 - $747 64 $(-3,859) - $29,544
332,698
kWh
$574
37
kW-months/year
$962
-
$
$747
64
MMBtu
$(-3,859)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost