IAC logo
IAC Assessment: UC2502
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UC2502
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Connecticut
Assessment Year 2024
Principal Product Pharmaceutical drugs
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $50,000,000-$100,000,000
# of Employees 442
Plant Area (Sq.Ft.) 105,000
Annual Production 14,000,000,000 Units
Production Hrs. Annual 6,000
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $702,218 9,917,359 kWh $0.07
Electricity Demand $37,461 9,232 kW-months/year $4.06
Electricity Fees $45,954 - $ -
Natural Gas $41,928 3,443 MMBtu $12.18
TOTAL ENERGY COSTS $827,561
RECOMMENDED SAVINGS* $99,526 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$3,276
Cost:
-
- - - - $3,276 - - - - - -
-
kWh
-
-
kW-months/year
$3,276
-
$
-
-
$
-
-
$
02: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$39,411
Cost:
-
- - - - - - $39,411 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$39,411
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$21,295
Cost:
$75
$19,105 269,841 $2,190 540 - - - - - - $19,105
269,841
kWh
$2,190
540
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,421
Cost:
$3,292
$8,324 117,560 $2,593 639 - - - - $503 - $8,324
117,560
kWh
$2,593
639
kW-months/year
-
-
$
-
-
$
$503
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$10,766
Cost:
$2,067
$9,554 134,928 $1,212 299 - - - - - - $9,554
134,928
kWh
$1,212
299
kW-months/year
-
-
$
-
-
$
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$12,866
Cost:
$75
$12,866 181,717 - - - - - - - - $12,866
181,717
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
07: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$493
Cost:
$2,446
$455 6,427 $37 9 - - - - - - $455
6,427
kWh
$37
9
kW-months/year
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$99,526
Cost:
$7,955
$50,303 710,473 $6,033 1,487 $3,276 - $39,411 - $503 - $50,303
710,473
kWh
$6,033
1,487
kW-months/year
$3,276
-
$
$39,411
-
$
$503
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $