IAC logo
IAC Assessment: UC2509
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UC2509
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Connecticut
Assessment Year 2024
Principal Product Metallized films
NAICS 334416 - Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3675 - Electronic Capacitors
Sales $5,000,000-$10,000,000
# of Employees 42
Plant Area (Sq.Ft.) 126,000
Annual Production 493,000 Pounds
Production Hrs. Annual 4,000
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $489,816 3,123,412 kWh $0.16
Electricity Demand $112,654 11,555 kW-months/year $9.75
Electricity Fees $36,525 - $ -
Fuel Oil #2 $152,753 7,431 MMBtu $20.56
TOTAL ENERGY COSTS $791,748
RECOMMENDED SAVINGS* $146,877 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Administrative Changes Electricity Usage Electricity Demand Fuel Oil #2 Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$28,237
Cost:
-
- - - - - - $28,237 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$28,237
-
$
02: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$114
Cost:
-
- - - - - - $114 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$114
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$19,546
Cost:
$32,370
- - - - - - $19,546 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$19,546
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,936
Cost:
$100
$2,511 16,011 $425 44 - - - - $2,511
16,011
kWh
$425
44
kW-months/year
-
-
MMBtu
-
-
$
05: 2.1224 REPLACE BOILER Savings:
$42,258
Cost:
$132,297
- - - - $42,258 2,055 - - -
-
kWh
-
-
kW-months/year
$42,258
2,055
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,269
Cost:
$1,190
$2,269 14,469 - - - - - - $2,269
14,469
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,347
Cost:
$2,798
- - - - $8,347 406 - - -
-
kWh
-
-
kW-months/year
$8,347
406
MMBtu
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$29,692
Cost:
$9,100
$27,361 174,499 $2,331 239 - - - - $27,361
174,499
kWh
$2,331
239
kW-months/year
-
-
MMBtu
-
-
$
09: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$13,478
Cost:
$50
$13,478 85,955 - - - - - - $13,478
85,955
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$146,877
Cost:
$177,905
$45,619 290,934 $2,756 283 $50,605 2,461 $47,897 - $45,619
290,934
kWh
$2,756
283
kW-months/year
$50,605
2,461
MMBtu
$47,897
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Fuel Oil #2 Administrative Changes Electricity Usage Electricity Demand Fuel Oil #2 Administrative Changes