Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Connecticut |
---|---|
Assessment Year | 2024 |
Principal Product | Metallized films |
NAICS | 334416 - Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing |
SIC | 3675 - Electronic Capacitors |
Sales | $5,000,000-$10,000,000 |
# of Employees | 42 |
Plant Area (Sq.Ft.) | 126,000 |
Annual Production | 493,000 Pounds |
Production Hrs. Annual | 4,000 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $489,816 | 3,123,412 | kWh | $0.16 |
Electricity Demand | $112,654 | 11,555 | kW-months/year | $9.75 |
Electricity Fees | $36,525 | - | $ | - |
Fuel Oil #2 | $152,753 | 7,431 | MMBtu | $20.56 |
TOTAL ENERGY COSTS | $791,748 | |||
RECOMMENDED SAVINGS* | $146,877 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #2 | Administrative Changes | Electricity Usage | Electricity Demand | Fuel Oil #2 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $28,237 Cost: - |
- | - | - | - | - | - | $28,237 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$28,237 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $114 Cost: - |
- | - | - | - | - | - | $114 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$114 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $19,546 Cost: $32,370 |
- | - | - | - | - | - | $19,546 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$19,546 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,936 Cost: $100 |
$2,511 | 16,011 | $425 | 44 | - | - | - | - |
$2,511 16,011 kWh |
$425 44 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1224 REPLACE BOILER |
Savings: $42,258 Cost: $132,297 |
- | - | - | - | $42,258 | 2,055 | - | - |
- - kWh |
- - kW-months/year |
$42,258 2,055 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,269 Cost: $1,190 |
$2,269 | 14,469 | - | - | - | - | - | - |
$2,269 14,469 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $8,347 Cost: $2,798 |
- | - | - | - | $8,347 | 406 | - | - |
- - kWh |
- - kW-months/year |
$8,347 406 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $29,692 Cost: $9,100 |
$27,361 | 174,499 | $2,331 | 239 | - | - | - | - |
$27,361 174,499 kWh |
$2,331 239 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $13,478 Cost: $50 |
$13,478 | 85,955 | - | - | - | - | - | - |
$13,478 85,955 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $146,877 Cost: $177,905 |
$45,619 | 290,934 | $2,756 | 283 | $50,605 | 2,461 | $47,897 | - | $45,619 290,934 kWh |
$2,756 283 kW-months/year |
$50,605 2,461 MMBtu |
$47,897 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #2 | Administrative Changes | Electricity Usage | Electricity Demand | Fuel Oil #2 | Administrative Changes |