IAC logo
IAC Assessment: UD0047
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0047
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1982
Principal Product MEN'S/WOMEN'S SUITS
NAICS n/a
SIC 2311 - Men's and Boys' Suits, Coats, and Overcoats
Sales $5,000,000-$10,000,000
# of Employees 330
Plant Area (Sq.Ft.) 0
Annual Production 30,000 Pieces
Production Hrs. Annual 1,600
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $85,247 1,002,345 kWh $0.09
Natural Gas $51,204 13,859 MMBtu $3.69
Fuel Oil #2 $4,600 700 MMBtu $6.57
TOTAL ENERGY COSTS $141,051
RECOMMENDED SAVINGS* $17,314 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,843
Cost:
$600
- - $3,600 732 $243 37 -
-
kWh
$3,600
732
MMBtu
$243
37
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,175
Cost:
$122
$2,440 27,843 $(-265) (-54) - - $2,440
27,843
kWh
$(-265)
(-54)
MMBtu
-
-
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$4,878
Cost:
$2,288
$2,362 24,033 $2,516 511 - - $2,362
24,033
kWh
$2,516
511
MMBtu
-
-
MMBtu
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,352
Cost:
$1,500
$678 6,741 $674 137 - - $678
6,741
kWh
$674
137
MMBtu
-
-
MMBtu
05: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$5,066
Cost:
$6,048
- - $5,066 1,030 - - -
-
kWh
$5,066
1,030
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$17,314
Cost:
$10,558
$5,480 58,617 $11,591 2,356 $243 37 $5,480
58,617
kWh
$11,591
2,356
MMBtu
$243
37
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2