IAC Assessment: UD0082
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0082
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1983
Principal Product CHROME PLATED PLASTIC
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 112
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 6,700
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $68,998 1,348,183 kWh $0.05
Natural Gas $27,161 5,906 MMBtu $4.60
TOTAL ENERGY COSTS $96,159
RECOMMENDED SAVINGS* $6,723 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$820
Cost:
$206
$1,024 21,102 $(-204) (-38) - - $1,024
21,102
kWh
$(-204)
(-38)
MMBtu
-
-
$
02: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$170
Cost:
-
$170 3,224 - - - - $170
3,224
kWh
-
-
MMBtu
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$922
Cost:
$1,200
$1,176 24,912 $(-254) (-47) - - $1,176
24,912
kWh
$(-254)
(-47)
MMBtu
-
-
$
04: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$4,811
Cost:
-
$(-221) (-4,396) $2,206 408 $2,826 - $(-221)
(-4,396)
kWh
$2,206
408
MMBtu
$2,826
-
$
TOTAL RECOMMENDED Savings:
$6,723
Cost:
$1,406
$2,149 44,842 $1,748 323 $2,826 - $2,149
44,842
kWh
$1,748
323
MMBtu
$2,826
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes