IAC logo
IAC Assessment: UD0113
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0113
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1984
Principal Product WATER COOLERS
NAICS n/a
SIC 3585 - Refrigeration And Heating Equipment
Sales $50,000,000-$100,000,000
# of Employees 307
Plant Area (Sq.Ft.) 0
Annual Production 260,000 Pieces
Production Hrs. Annual 2,250
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $292,148 4,274,619 kWh $0.07
Natural Gas $134,843 22,409 MMBtu $6.02
TOTAL ENERGY COSTS $426,991
RECOMMENDED SAVINGS* $57,013 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $57,013
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,926
Cost:
$62,859
$28,604 446,952 $(-3,678) (-598) $28,604
446,952
kWh
$(-3,678)
(-598)
MMBtu
02: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$15,633
Cost:
$4,906
$2,452 35,756 $13,181 2,143 $2,452
35,756
kWh
$13,181
2,143
MMBtu
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,847
Cost:
-
$1,053 22,567 $794 129 $1,053
22,567
kWh
$794
129
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$608
Cost:
$200
- - $608 99 -
-
kWh
$608
99
MMBtu
05: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$13,999
Cost:
$30,000
$13,999 26,377 - - $13,999
26,377
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$57,013
Cost:
$97,965
$46,108 531,652 $10,905 1,773 $46,108
531,652
kWh
$10,905
1,773
MMBtu
TOTAL IMPLEMENTED Savings:
$57,013
Cost:
$97,965
$46,108 531,652 $10,905 1,773 $46,108
531,652
kWh
$10,905
1,773
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas