IAC logo
IAC Assessment: UD0150
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0150
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1985
Principal Product SMALL WATER PUMPS
NAICS n/a
SIC 3647 - Vehicular Lighting Equipment
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,100
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $79,537 847,011 kWh $0.09
Natural Gas $48,628 7,736 MMBtu $6.29
Fuel Oil #2 $11,278 1,820 MMBtu $6.20
TOTAL ENERGY COSTS $139,443
RECOMMENDED SAVINGS* $16,291 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,006
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$2,440
Cost:
-
$2,440 24,033 - - $2,440
24,033
kWh
-
-
MMBtu
02: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$7,089
Cost:
$4,000
$(-287) (-2,052) $7,376 1,156 $(-287)
(-2,052)
kWh
$7,376
1,156
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,196
Cost:
$2,972
$3,732 35,756 $(-536) (-84) $3,732
35,756
kWh
$(-536)
(-84)
MMBtu
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$646
Cost:
$140
$646 16,120 - - $646
16,120
kWh
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$702
Cost:
$3,000
- - $702 110 -
-
kWh
$702
110
MMBtu
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,218
Cost:
$1,360
$2,924 24,326 $(-706) (-111) $2,924
24,326
kWh
$(-706)
(-111)
MMBtu
TOTAL RECOMMENDED Savings:
$16,291
Cost:
$11,472
$9,455 98,183 $6,836 1,071 $9,455
98,183
kWh
$6,836
1,071
MMBtu
TOTAL IMPLEMENTED Savings:
$6,006
Cost:
$4,500
$6,010 64,479 $(-4) (-1) $6,010
64,479
kWh
$(-4)
(-1)
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas