IAC logo
IAC Assessment: UD0161
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0161
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1985
Principal Product CORRUGATED CONTAINERS
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 165
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $272,071 4,961,899 kWh $0.05
Natural Gas $310,732 55,808 MMBtu $5.57
LPG $18,749 2,121 MMBtu $8.84
TOTAL ENERGY COSTS $601,552
RECOMMENDED SAVINGS* $109,278 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,890
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$26,916
Cost:
$40,000
$26,916 - - - $26,916
-
kWh
-
-
MMBtu
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$3,600
Cost:
$3,000
$3,600 - - - $3,600
-
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,398
Cost:
$10,864
$4,263 79,719 $(-865) (-156) $4,263
79,719
kWh
$(-865)
(-156)
MMBtu
04: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$861
Cost:
$1,000
$861 26,964 - - $861
26,964
kWh
-
-
MMBtu
05: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$9,744
Cost:
$1,377
$2,684 47,773 $7,060 1,273 $2,684
47,773
kWh
$7,060
1,273
MMBtu
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$8,671
Cost:
$2,100
- - $8,671 1,563 -
-
kWh
$8,671
1,563
MMBtu
07: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$23,960
Cost:
$48,000
- - $23,960 4,320 -
-
kWh
$23,960
4,320
MMBtu
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$32,128
Cost:
$40,000
- - $32,128 5,793 -
-
kWh
$32,128
5,793
MMBtu
TOTAL RECOMMENDED Savings:
$109,278
Cost:
$146,341
$38,324 154,456 $70,954 12,793 $38,324
154,456
kWh
$70,954
12,793
MMBtu
TOTAL IMPLEMENTED Savings:
$36,890
Cost:
$61,964
$5,124 106,683 $31,766 5,727 $5,124
106,683
kWh
$31,766
5,727
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas