IAC Assessment: UD0185
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0185
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1985
Principal Product HARDBOARD & PARTICLE BOARD
NAICS n/a
SIC 2493 - Reconstituted Wood Products
Sales $5,000,000-$10,000,000
# of Employees 140
Plant Area (Sq.Ft.) 0
Annual Production 60,000 Thousand Feet
Production Hrs. Annual 4,250
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $169,098 2,123,974 kWh $0.08
Natural Gas $69,332 13,304 MMBtu $5.21
TOTAL ENERGY COSTS $238,430
RECOMMENDED SAVINGS* $52,120 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,456
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$33,827
Cost:
$54,000
$39,385 218,933 $(-5,558) (-1,067) - - $39,385
218,933
kWh
$(-5,558)
(-1,067)
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,629
Cost:
$30,202
$11,431 185,229 $(-2,533) (-486) $3,731 - $11,431
185,229
kWh
$(-2,533)
(-486)
MMBtu
$3,731
-
$
03: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$2,108
Cost:
$5,100
- - $2,108 405 - - -
-
kWh
$2,108
405
MMBtu
-
-
$
04: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$3,556
Cost:
$9,700
- - $3,556 683 - - -
-
kWh
$3,556
683
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$52,120
Cost:
$99,002
$50,816 404,162 $(-2,427) (-465) $3,731 - $50,816
404,162
kWh
$(-2,427)
(-465)
MMBtu
$3,731
-
$
TOTAL IMPLEMENTED Savings:
$46,456
Cost:
$84,202
$50,816 404,162 $(-8,091) (-1,553) $3,731 - $50,816
404,162
kWh
$(-8,091)
(-1,553)
MMBtu
$3,731
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes