Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1986 |
Principal Product | RR TRACKWORK PRODUCTS |
NAICS | n/a |
SIC | 3743 - Railroad Equipment |
Sales | $10,000,000-$50,000,000 |
# of Employees | 67 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 0 Units |
Production Hrs. Annual | 5,200 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $135,738 | 2,017,878 | kWh | $0.07 |
Natural Gas | $77,417 | 15,115 | MMBtu | $5.12 |
Fuel Oil #2 | $39,169 | 7,000 | MMBtu | $5.60 |
TOTAL ENERGY COSTS | $252,324 | |||
RECOMMENDED SAVINGS* | $78,430 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $13,891 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Fuel Oil #2 | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #2 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $52,010 Cost: $16,000 |
$12,841 | 234,174 | - | - | $39,169 | 7,000 | - | - |
$12,841 234,174 kWh |
- - MMBtu |
$39,169 7,000 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7494 INSTALL STORM WINDOWS AND DOORS |
Savings: $12,529 Cost: $16,200 |
- | - | $12,529 | 2,447 | - | - | - | - |
- - kWh |
$12,529 2,447 MMBtu |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $1,589 Cost: - |
$1,558 | 45,721 | $(-169) | (-33) | - | - | $200 | - |
$1,558 45,721 kWh |
$(-169) (-33) MMBtu |
- - MMBtu |
$200 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $3,168 Cost: - |
$3,348 | - | - | - | - | - | $(-180) | - |
$3,348 - kWh |
- - MMBtu |
- - MMBtu |
$(-180) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $9,134 Cost: $21,000 |
- | - | $8,284 | 1,618 | - | - | $850 | - |
- - kWh |
$8,284 1,618 MMBtu |
- - MMBtu |
$850 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $78,430 Cost: $53,200 |
$17,747 | 279,895 | $20,644 | 4,032 | $39,169 | 7,000 | $870 | - | $17,747 279,895 kWh |
$20,644 4,032 MMBtu |
$39,169 7,000 MMBtu |
$870 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $13,891 Cost: $21,000 |
$4,906 | 45,721 | $8,115 | 1,585 | - | - | $870 | - | $4,906 45,721 kWh |
$8,115 1,585 MMBtu |
- - MMBtu |
$870 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Fuel Oil #2 | Administrative Changes | Electricity Usage | Natural Gas | Fuel Oil #2 | Administrative Changes |