IAC Assessment: UD0213
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0213
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1987
Principal Product ALUMINUM CASTINGS
NAICS n/a
SIC 3363 - Aluminum Die-castings
Sales $10,000,000-$50,000,000
# of Employees 266
Plant Area (Sq.Ft.) 0
Annual Production 1,335 Tons
Production Hrs. Annual 6,240
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $445,469 9,191,090 kWh $0.05
Natural Gas $383,355 76,651 MMBtu $5.00
LPG $91,669 23,010 MMBtu $3.98
TOTAL ENERGY COSTS $920,493
RECOMMENDED SAVINGS* $80,327 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,446
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$14,229
Cost:
$20,000
$14,229 613,423 - - - - $14,229
613,423
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,000
Cost:
$10,000
$14,564 346,131 $(-1,352) (-288) $(-212) - $14,564
346,131
kWh
$(-1,352)
(-288)
MMBtu
$(-212)
-
$
03: 2.2428 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC Savings:
$45,881
Cost:
$100,000
- - $45,881 9,762 - - -
-
kWh
$45,881
9,762
MMBtu
-
-
$
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,036
Cost:
$2,000
$1,429 36,635 $(-393) (-84) - - $1,429
36,635
kWh
$(-393)
(-84)
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,181
Cost:
$15,000
- - $6,181 1,315 - - -
-
kWh
$6,181
1,315
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$80,327
Cost:
$147,000
$30,222 996,189 $50,317 10,705 $(-212) - $30,222
996,189
kWh
$50,317
10,705
MMBtu
$(-212)
-
$
TOTAL IMPLEMENTED Savings:
$34,446
Cost:
$47,000
$30,222 996,189 $4,436 943 $(-212) - $30,222
996,189
kWh
$4,436
943
MMBtu
$(-212)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes