IAC logo
IAC Assessment: UD0225
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0225
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1987
Principal Product AUTO SAFETY & LIGHTING
NAICS n/a
SIC 3647 - Vehicular Lighting Equipment
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 0
Annual Production 6,000,000 Pieces
Production Hrs. Annual 2,032
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $101,702 1,421,454 kWh $0.07
Natural Gas $89,342 17,649 MMBtu $5.06
TOTAL ENERGY COSTS $191,044
RECOMMENDED SAVINGS* $19,297 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,297
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,781
Cost:
$2,200
$2,781 - - - - - $2,781
-
kWh
-
-
MMBtu
-
-
$
02: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$1,298
Cost:
$1,000
- - $259 54 $1,039 - -
-
kWh
$259
54
MMBtu
$1,039
-
$
03: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$2,611
Cost:
$2,160
- - $2,611 544 - - -
-
kWh
$2,611
544
MMBtu
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$228
Cost:
$360
- - $228 48 - - -
-
kWh
$228
48
MMBtu
-
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,248
Cost:
$6,000
- - $4,248 885 - - -
-
kWh
$4,248
885
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,131
Cost:
$14,688
$7,414 109,027 $(-1,488) (-310) $2,205 - $7,414
109,027
kWh
$(-1,488)
(-310)
MMBtu
$2,205
-
$
TOTAL RECOMMENDED Savings:
$19,297
Cost:
$26,408
$10,195 109,027 $5,858 1,221 $3,244 - $10,195
109,027
kWh
$5,858
1,221
MMBtu
$3,244
-
$
TOTAL IMPLEMENTED Savings:
$19,297
Cost:
$26,408
$10,195 109,027 $5,858 1,221 $3,244 - $10,195
109,027
kWh
$5,858
1,221
MMBtu
$3,244
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes