IAC logo
IAC Assessment: UD0248
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0248
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1988
Principal Product PAPER BOXES
NAICS n/a
SIC 2652 - Setup Paperboard Boxes
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 0
Annual Production 1,800,000 Pieces
Production Hrs. Annual 4,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $94,887 1,001,172 kWh $0.09
Natural Gas $51,564 11,401 MMBtu $4.52
TOTAL ENERGY COSTS $146,451
RECOMMENDED SAVINGS* $23,377 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,345
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8112 COMBINE UTILITY METERS Savings:
$1,427
Cost:
-
- - - - $1,427 - -
-
kWh
-
-
MMBtu
$1,427
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$7,032
Cost:
$10,000
$7,032 - - - - - $7,032
-
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,309
Cost:
$400
$2,149 24,326 - - $160 - $2,149
24,326
kWh
-
-
MMBtu
$160
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,845
Cost:
$360
$1,354 18,171 $(-223) (-52) $714 - $1,354
18,171
kWh
$(-223)
(-52)
MMBtu
$714
-
$
05: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$4,094
Cost:
$6,880
- - $4,094 955 - - -
-
kWh
$4,094
955
MMBtu
-
-
$
06: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$6,670
Cost:
$4,038
- - $6,670 1,556 - - -
-
kWh
$6,670
1,556
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$23,377
Cost:
$21,678
$10,535 42,497 $10,541 2,459 $2,301 - $10,535
42,497
kWh
$10,541
2,459
MMBtu
$2,301
-
$
TOTAL IMPLEMENTED Savings:
$16,345
Cost:
$11,678
$3,503 42,497 $10,541 2,459 $2,301 - $3,503
42,497
kWh
$10,541
2,459
MMBtu
$2,301
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes