IAC logo
IAC Assessment: UD0260
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0260
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1988
Principal Product METAL STAMPINGS
NAICS n/a
SIC 3469 - Metal Stampings, Nec
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 0
Annual Production 8,000,000 Pounds
Production Hrs. Annual 4,800
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $132,778 1,844,959 kWh $0.07
Natural Gas $27,262 6,007 MMBtu $4.54
TOTAL ENERGY COSTS $160,040
RECOMMENDED SAVINGS* $14,112 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,518
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$4,647
Cost:
$500
$3,200 39,859 $1,447 362 - - $3,200
39,859
kWh
$1,447
362
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,125
Cost:
-
$3,374 - - - $(-249) - $3,374
-
kWh
-
-
MMBtu
$(-249)
-
$
03: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$1,025
Cost:
$2,000
$1,025 12,896 - - - - $1,025
12,896
kWh
-
-
MMBtu
-
-
$
04: 2.2532 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD Savings:
$1,447
Cost:
-
- - $1,447 362 - - -
-
kWh
$1,447
362
MMBtu
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,399
Cost:
$180
$1,448 19,930 $(-109) (-27) $60 - $1,448
19,930
kWh
$(-109)
(-27)
MMBtu
$60
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,469
Cost:
$200
$2,485 45,135 $(-241) (-60) $225 - $2,485
45,135
kWh
$(-241)
(-60)
MMBtu
$225
-
$
TOTAL RECOMMENDED Savings:
$14,112
Cost:
$2,880
$11,532 117,820 $2,544 637 $36 - $11,532
117,820
kWh
$2,544
637
MMBtu
$36
-
$
TOTAL IMPLEMENTED Savings:
$8,518
Cost:
$2,680
$5,673 72,685 $2,785 697 $60 - $5,673
72,685
kWh
$2,785
697
MMBtu
$60
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes