IAC logo
IAC Assessment: UD0277
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0277
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1989
Principal Product STORAGE EQUIPMENT
NAICS n/a
SIC 2542 - Partitions And Fixtures, Except Wood
Sales $10,000,000-$50,000,000
# of Employees 63
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,500
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,435 902,110 kWh $0.08
Natural Gas $78,193 24,391 MMBtu $3.21
TOTAL ENERGY COSTS $148,628
RECOMMENDED SAVINGS* $11,539 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,539
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,698
Cost:
$500
- - $3,698 1,335 - - -
-
kWh
$3,698
1,335
MMBtu
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,053
Cost:
$250
- - $2,053 741 - - -
-
kWh
$2,053
741
MMBtu
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,413
Cost:
$1,125
- - $2,413 871 - - -
-
kWh
$2,413
871
MMBtu
-
-
$
04: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$1,165
Cost:
$1,500
$1,213 48,945 $(-330) (-119) $282 - $1,213
48,945
kWh
$(-330)
(-119)
MMBtu
$282
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$746
Cost:
$1,500
$571 8,206 - - $175 - $571
8,206
kWh
-
-
MMBtu
$175
-
$
06: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$1,464
Cost:
$5,850
- - $1,464 529 - - -
-
kWh
$1,464
529
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$11,539
Cost:
$10,725
$1,784 57,151 $9,298 3,357 $457 - $1,784
57,151
kWh
$9,298
3,357
MMBtu
$457
-
$
TOTAL IMPLEMENTED Savings:
$11,539
Cost:
$10,725
$1,784 57,151 $9,298 3,357 $457 - $1,784
57,151
kWh
$9,298
3,357
MMBtu
$457
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes