IAC logo
IAC Assessment: UD0301
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0301
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1990
Principal Product ELECT. WIRE ROPE HEISTS
NAICS n/a
SIC 3536 - Hoists, Cranes, And Monorails
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 1,400 Pieces
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $171,916 2,038,980 kWh $0.08
Natural Gas $50,400 14,000 MMBtu $3.60
TOTAL ENERGY COSTS $222,316
RECOMMENDED SAVINGS* $32,985 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,320
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,313
Cost:
-
$2,313 - - - - - $2,313
-
kWh
-
-
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$9,236
Cost:
-
$9,636 - - - $(-400) - $9,636
-
kWh
-
-
MMBtu
$(-400)
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$8,636
Cost:
-
$9,636 - - - $(-1,000) - $9,636
-
kWh
-
-
MMBtu
$(-1,000)
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$7,480
Cost:
-
$8,480 - - - $(-1,000) - $8,480
-
kWh
-
-
MMBtu
$(-1,000)
-
$
05: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,252
Cost:
-
$1,448 66,237 $(-508) (-141) $312 - $1,448
66,237
kWh
$(-508)
(-141)
MMBtu
$312
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,399
Cost:
-
$1,535 15,533 $(-136) (-38) - - $1,535
15,533
kWh
$(-136)
(-38)
MMBtu
-
-
$
07: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$1,574
Cost:
$5,000
- - $1,574 437 - - -
-
kWh
$1,574
437
MMBtu
-
-
$
08: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$1,095
Cost:
$7,500
- - $1,095 304 - - -
-
kWh
$1,095
304
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$32,985
Cost:
$12,500
$33,048 81,770 $2,025 562 $(-2,088) - $33,048
81,770
kWh
$2,025
562
MMBtu
$(-2,088)
-
$
TOTAL IMPLEMENTED Savings:
$5,320
Cost:
$12,500
$2,983 81,770 $2,025 562 $312 - $2,983
81,770
kWh
$2,025
562
MMBtu
$312
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes