IAC logo
IAC Assessment: UD0360
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0360
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1991
Principal Product FIBERGLASS PANEL
NAICS n/a
SIC 2821 - Plastics Materials And Resins
Sales $50,000,000-$100,000,000
# of Employees 130
Plant Area (Sq.Ft.) 0
Annual Production 40,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) KY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $220,055 4,773,154 kWh $0.05
Natural Gas $361,083 144,998 MMBtu $2.49
TOTAL ENERGY COSTS $581,138
RECOMMENDED SAVINGS* $23,623 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,936
Cost:
$4,500
$3,936 - - - $3,936
-
kWh
-
-
MMBtu
02: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$4,115
Cost:
-
$4,115 127,491 - - $4,115
127,491
kWh
-
-
MMBtu
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$931
Cost:
-
$931 19,637 - - $931
19,637
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$885
Cost:
-
$885 11,723 - - $885
11,723
kWh
-
-
MMBtu
05: 2.1224 REPLACE BOILER Savings:
$13,756
Cost:
-
- - $13,756 4,381 -
-
kWh
$13,756
4,381
MMBtu
TOTAL RECOMMENDED Savings:
$23,623
Cost:
$4,500
$9,867 158,851 $13,756 4,381 $9,867
158,851
kWh
$13,756
4,381
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas