IAC Assessment: UD0369
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0369
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1992
Principal Product THERMAL SPRAY COATING
NAICS n/a
SIC 3479 - Metal Coating And Allied Services
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 0
Annual Production 99,000 Pieces
Production Hrs. Annual 7,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $143,543 2,417,644 kWh $0.06
Natural Gas $63,684 14,381 MMBtu $4.43
TOTAL ENERGY COSTS $207,227
RECOMMENDED SAVINGS* $45,822 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,629
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$612
Cost:
$1,600
$612 - - - $612
-
kWh
-
-
MMBtu
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$7,020
Cost:
-
$7,020 - - - $7,020
-
kWh
-
-
MMBtu
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$9,504
Cost:
-
$9,504 - - - $9,504
-
kWh
-
-
MMBtu
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$850
Cost:
-
$850 21,688 - - $850
21,688
kWh
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,413
Cost:
$300
- - $6,413 1,733 -
-
kWh
$6,413
1,733
MMBtu
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$15,581
Cost:
$25,000
$11,868 301,290 $3,713 1,003 $11,868
301,290
kWh
$3,713
1,003
MMBtu
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$5,842
Cost:
$1,800
- - $5,842 1,579 -
-
kWh
$5,842
1,579
MMBtu
TOTAL RECOMMENDED Savings:
$45,822
Cost:
$28,700
$29,854 322,978 $15,968 4,315 $29,854
322,978
kWh
$15,968
4,315
MMBtu
TOTAL IMPLEMENTED Savings:
$29,629
Cost:
$2,100
$17,374 21,688 $12,255 3,312 $17,374
21,688
kWh
$12,255
3,312
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas