IAC logo
IAC Assessment: UD0373
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0373
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1992
Principal Product STEEL PROCESSING
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 122
Plant Area (Sq.Ft.) 0
Annual Production 500,000 Tons
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $361,504 8,054,514 kWh $0.04
Natural Gas $213,073 50,992 MMBtu $4.18
TOTAL ENERGY COSTS $574,577
RECOMMENDED SAVINGS* $34,942 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,384
#|Description Savings
Cost
Status Electricity Usage Natural Gas Coal Administrative Changes Electricity Usage Natural Gas Coal Administrative Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,664
Cost:
$8,600
$6,664 - - - - - - - $6,664
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,724
Cost:
-
$1,724 73,857 - - - - - - $1,724
73,857
kWh
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,415
Cost:
$3,000
- - $5,415 1,354 - - - - -
-
kWh
$5,415
1,354
MMBtu
-
-
MMBtu
-
-
$
04: 3.4155 METER WASTE WATER Savings:
$14,996
Cost:
$300,000
- - - - - - $14,996 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
$14,996
-
$
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$6,143
Cost:
$15,000
- - - - $6,143 3,240 - - -
-
kWh
-
-
MMBtu
$6,143
3,240
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$34,942
Cost:
$326,600
$8,388 73,857 $5,415 1,354 $6,143 3,240 $14,996 - $8,388
73,857
kWh
$5,415
1,354
MMBtu
$6,143
3,240
MMBtu
$14,996
-
$
TOTAL IMPLEMENTED Savings:
$23,384
Cost:
$308,600
$8,388 73,857 - - - - $14,996 - $8,388
73,857
kWh
-
-
MMBtu
-
-
MMBtu
$14,996
-
$
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ $
Electricity Usage Natural Gas Coal Administrative Changes Electricity Usage Natural Gas Coal Administrative Changes