IAC logo
IAC Assessment: UD0426
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0426
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1994
Principal Product Aluminum castings
NAICS n/a
SIC 3365 - Aluminum Foundries
Sales $5,000,000-$10,000,000
# of Employees 90
Plant Area (Sq.Ft.) 68,000
Annual Production 3,000 Tons
Production Hrs. Annual 3,300
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $126,407 1,464,537 kWh $0.09
Natural Gas $105,267 19,926 MMBtu $5.28
TOTAL ENERGY COSTS $231,674
RECOMMENDED SAVINGS* $35,755 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,413
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Energy Electricity Usage Natural Gas Other Energy
$ kWh $ MMBtu $ MMBtu
01: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$24,064
Cost:
$500
- - - - $24,064 1,203 -
-
kWh
-
-
MMBtu
$24,064
1,203
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,565
Cost:
$38,000
$3,671 40,152 $1,894 364 - - $3,671
40,152
kWh
$1,894
364
MMBtu
-
-
MMBtu
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,342
Cost:
-
$3,342 - - - - - $3,342
-
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,032
Cost:
$400
$1,032 12,603 - - - - $1,032
12,603
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,752
Cost:
$2,000
- - $1,752 337 - - -
-
kWh
$1,752
337
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$35,755
Cost:
$40,900
$8,045 52,755 $3,646 701 $24,064 1,203 $8,045
52,755
kWh
$3,646
701
MMBtu
$24,064
1,203
MMBtu
TOTAL IMPLEMENTED Savings:
$32,413
Cost:
$40,900
$4,703 52,755 $3,646 701 $24,064 1,203 $4,703
52,755
kWh
$3,646
701
MMBtu
$24,064
1,203
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu