IAC logo
IAC Assessment: UD0428
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0428
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1994
Principal Product service station valves & pipe fittings
NAICS n/a
SIC 3494 - Valves And Pipe Fittings, Nec
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 240,000
Annual Production 0 Units
Production Hrs. Annual 7,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $319,465 6,646,249 kWh $0.05
Natural Gas $49,587 9,540 MMBtu $5.20
TOTAL ENERGY COSTS $369,052
RECOMMENDED SAVINGS* $61,080 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,895
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$32,291
Cost:
$75,000
$43,383 500,000 $(-11,092) (-2,199) - - $43,383
500,000
kWh
$(-11,092)
(-2,199)
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,373
Cost:
$2,400
$1,793 82,356 - - $580 - $1,793
82,356
kWh
-
-
MMBtu
$580
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,231
Cost:
$46,256
$4,820 220,985 - - $1,411 - $4,820
220,985
kWh
-
-
MMBtu
$1,411
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$20,185
Cost:
$57,200
$14,480 664,127 - - $5,705 - $14,480
664,127
kWh
-
-
MMBtu
$5,705
-
$
TOTAL RECOMMENDED Savings:
$61,080
Cost:
$180,856
$64,476 1,467,468 $(-11,092) (-2,199) $7,696 - $64,476
1,467,468
kWh
$(-11,092)
(-2,199)
MMBtu
$7,696
-
$
TOTAL IMPLEMENTED Savings:
$40,895
Cost:
$123,656
$49,996 803,341 $(-11,092) (-2,199) $1,991 - $49,996
803,341
kWh
$(-11,092)
(-2,199)
MMBtu
$1,991
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes