IAC Assessment: UD0465
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0465
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1995
Principal Product fiberglass reinforced plastic truck/cab roofs
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 60,000
Annual Production 12,500 Pieces
Production Hrs. Annual 3,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $101,050 1,201,055 kWh $0.08
Natural Gas $26,159 5,364 MMBtu $4.88
TOTAL ENERGY COSTS $127,209
RECOMMENDED SAVINGS* $244,791 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $244,791
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost
$ kWh $ MMBtu $ lb $ $ $ $
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$8,418
Cost:
$300
$7,668 94,666 - - - - - - $750 - $7,668
94,666
kWh
-
-
MMBtu
-
-
lb
-
-
$
$750
-
$
02: 3.2173 CONVERT TO ROBOTIC PAINTING Savings:
$232,030
Cost:
$200,000
$(-7,303) (-89,977) - - $58,775 150,000 $180,558 - - - $(-7,303)
(-89,977)
kWh
-
-
MMBtu
$58,775
150,000
lb
$180,558
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,058
Cost:
$3,000
- - $2,058 490 - - - - - - -
-
kWh
$2,058
490
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,766
Cost:
$3,255
$1,766 21,688 - - - - - - - - $1,766
21,688
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.7122 DISCONNECT BALLASTS Savings:
$519
Cost:
-
$560 7,034 $(-66) (-16) - - $25 - - - $560
7,034
kWh
$(-66)
(-16)
MMBtu
-
-
lb
$25
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$244,791
Cost:
$206,555
$2,691 33,411 $1,992 474 $58,775 150,000 $180,583 - $750 - $2,691
33,411
kWh
$1,992
474
MMBtu
$58,775
150,000
lb
$180,583
-
$
$750
-
$
TOTAL IMPLEMENTED Savings:
$244,791
Cost:
$206,555
$2,691 33,411 $1,992 474 $58,775 150,000 $180,583 - $750 - $2,691
33,411
kWh
$1,992
474
MMBtu
$58,775
150,000
lb
$180,583
-
$
$750
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $ $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost