Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 1995 |
Principal Product | fiberglass reinforced plastic truck/cab roofs |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 12,500 Pieces |
Production Hrs. Annual | 3,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $101,050 | 1,201,055 | kWh | $0.08 |
Natural Gas | $26,159 | 5,364 | MMBtu | $4.88 |
TOTAL ENERGY COSTS | $127,209 | |||
RECOMMENDED SAVINGS* | $244,791 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $244,791 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $8,418 Cost: $300 |
$7,668 | 94,666 | - | - | - | - | - | - | $750 | - |
$7,668 94,666 kWh |
- - MMBtu |
- - lb |
- - $ |
$750 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.2173 CONVERT TO ROBOTIC PAINTING |
Savings: $232,030 Cost: $200,000 |
$(-7,303) | (-89,977) | - | - | $58,775 | 150,000 | $180,558 | - | - | - |
$(-7,303) (-89,977) kWh |
- - MMBtu |
$58,775 150,000 lb |
$180,558 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,058 Cost: $3,000 |
- | - | $2,058 | 490 | - | - | - | - | - | - |
- - kWh |
$2,058 490 MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,766 Cost: $3,255 |
$1,766 | 21,688 | - | - | - | - | - | - | - | - |
$1,766 21,688 kWh |
- - MMBtu |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7122 DISCONNECT BALLASTS |
Savings: $519 Cost: - |
$560 | 7,034 | $(-66) | (-16) | - | - | $25 | - | - | - |
$560 7,034 kWh |
$(-66) (-16) MMBtu |
- - lb |
$25 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $244,791 Cost: $206,555 |
$2,691 | 33,411 | $1,992 | 474 | $58,775 | 150,000 | $180,583 | - | $750 | - | $2,691 33,411 kWh |
$1,992 474 MMBtu |
$58,775 150,000 lb |
$180,583 - $ |
$750 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $244,791 Cost: $206,555 |
$2,691 | 33,411 | $1,992 | 474 | $58,775 | 150,000 | $180,583 | - | $750 | - | $2,691 33,411 kWh |
$1,992 474 MMBtu |
$58,775 150,000 lb |
$180,583 - $ |
$750 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost |